Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 19 Nov 2026 |
| Application filed | 31 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Mahindra and Mahindra LTD |
| Use | Industrial |
| Land area | 678.1 acres (274.4 ha) |
| Built-up area | 15,03,760 m² (1,61,86,322 sq ft) |
| Project cost | ₹700 crore |
| Village / locality | Nighoje |
| Taluk / tehsil | Khed |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-13935 |
In context
3,029 applications in Pune since January 2022 are in the same category (Buildings & townships): 2,001 approved, 415 filed or under review, and 613 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 678.1 acres, this one is larger than 100% of them.
59 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nighoje, Khed, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Hotel Project — environmental approval granted, 750 m away
- Proposed Hotel Project — lapsed, 750 m away
- Expansion in proposed project "Mantra Residency", at Gat No.1, Village… — environmental approval granted, 1.9 km away
- Shri. Shandu Maruti Yelwande — environmental approval granted, 2.1 km away
- Eastern part of Pune Ring Road from Urse (Km 00.000) to Solu (Km 38.340)… — under forest review, 2.1 km away
- Environmental Clearance for Proposed Industrial sheds Gat No. 11(P), 13(P),… — environmental approval granted, 2.2 km away
- "Nayanta University" by M/s Nayanta Education Foundation — initial checks, 2.3 km away
- Environmental Clearance for Proposed Township project "Gatha Gram" at S. No.… — environmental approval granted, 2.3 km away
All 14 Mahindra and Mahindra projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.