Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 29 Oct 2026 |
| Application filed | 6 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Maschio Gaspardo India Private Limited |
| Use | Industrial |
| Land area | 24.7 acres (10 ha) |
| Project cost | ₹335 crore |
| Village / locality | Sanaswadi |
| Taluk / tehsil | Shirur |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-13999 |
In context
3,029 applications in Pune since January 2022 are in the same category (Buildings & townships): 2,001 approved, 415 filed or under review, and 613 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 24.7 acres, this one is larger than 88% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sanaswadi, Shirur, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Clearance for Proposed Industrial sheds at plot No. 3, 3A and 3B… — environmental approval granted, 250 m away
- Environmental Clearance for Proposed Industrial building Gat no. 991, 992,… — under environmental review, 400 m away
- Environmental Clearance for Proposed Industrial building Gat no. 991, 992,… — environmental approval granted, 400 m away
- Proposed Expansion of Synthetic organic chemicals by Foseco India Ltd. located… — cleared for impact study, 750 m away
- Regularised Existing Undeground Insulated Electric Line Which Is Passing… — more information requested, 950 m away
- Warehouse/Industrial/Logistics/Assembling Park project by M/s Enroot IAL Asset… — environmental approval granted, 1.7 km away
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — lapsed, 1.7 km away
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — lapsed, 1.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.