Quick answers
What is this project?
Sponge Iron Manufacturing Plant JSW GREEN STEEL LIMITED -Transfer of EC is a lapsed industrial project in Salav, Murud, Raigarh, Maharashtra. The site covers 210 acres.
Who is building it?
The applicant is Jsw Green Steel Limited.
Has it been approved?
No. The application was lapsed on 2 May 2026, so it is no longer under consideration.
Where is it?
In Salav, Murud, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹1,134.3 crore and a site of 210 acres.
When was it filed?
The application was filed on 2 May 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 2 May 2026 |
| Application filed | 2 May 2026 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Jsw Green Steel Limited |
| Land area | 210 acres (85 ha) |
| Project cost | ₹1,134.3 crore |
| Village / locality | Salav |
| Taluk / tehsil | Murud |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14016 |
In context
260 applications in Raigarh since January 2022 are in the same category (Industry): 152 approved, 67 filed or under review, and 41 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 210 acres, this one is larger than 92% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Salav, Murud, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Reserved Forest Land Survey No. 44/0 of Village Korlai Tal.… — more information requested, 2.6 km away
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at… — coastal clearance granted, 2.9 km away
- Proposed Clearing of Navigational Channel (Maintenance Dredging) at… — lapsed, 2.9 km away
- Rehabilitation and Upgradation of Revas-Reddi Coastal Highway MSH-04 to four /… — more information requested, 2.9 km away
- Major Bridge Across Kundalika Creek Between Revdanda to Salav — coastal clearance granted, 3 km away
- Diversion of Reserved Forest Land Survey No. 44/0 of Village Korlai Tal.… — lapsed, 3.4 km away
- CRZ Clearance For Proposed Tourist Home Project located at Gat no. 66 and 67,… — recommended by coastal authority, 4 km away
- Proposed reconstruction of existing structure on plot baring Gat No 116/1/A/1… — returned to applicant, 4.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.