What is Developing? Open the mapMap

Cleared for impact studyBuildings & townships · Mumbai Suburban, Maharashtra

Proposed S.R.A Scheme under 33(11) on plot bearing CTS NO. 4A/1A/2A (pt), 4A/1A/2B (pt), 4A/1A/2C(pt), of village Hariyali, District: Kurla at Vikhroli East, Mumbai with proposed new S.R. Scheme under 33(10) on plot bearing {old CTS no. 4, 4D/2(pt), 5(pt)} New CTS No. 4D/1, 4D/2,4A/1A/2A, 4A/1A/2E, 4A/1A(pt) of village Hariyali, District Kurla for Chandan Nagar CHS (prop) by M/s. Mahadev Realtors Powai Pvt. Ltd. (Formerly known as- Mahadev Spaceinnovator Private Limited)

Proposed S.R.A Scheme under 33(11) on plot bearing CTS NO. 4A/1A/2A (pt), 4A/1A/2B (pt), 4A/1A/2C(pt), of village Hariyali, District: Kurla at Vikhroli East, Mumbai with proposed new S.R. Scheme under 33(10) on plot bearing {old CTS no. 4, 4D/2(pt), 5(pt)} New CTS No. 4D/1, 4D/2,4A/1A/2A, 4A/1A/2E, 4A/1A(pt) of village Hariyali, District Kurla for Chandan Nagar CHS (prop) by M/s. Mahadev Realtors Powai Pvt. Ltd. (Formerly known as- Mahadev Spaceinnovator Private Limited) is a proposed residential project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 3.2 acres. Its stated project cost is ₹894.2 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 2 Feb 2026).

See it on the live map All projects in Mumbai Suburban

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed S.R.A Scheme under 33(11) on plot bearing CTS NO. 4A/1A/2A (pt), 4A/1A/2B (pt), 4A/1A/2C(pt), of village Hariyali, District: Kurla at Vikhroli East, Mumbai with proposed new S.R. Scheme under 33(10) on plot bearing {old CTS no. 4, 4D/2(pt), 5(pt)} New CTS No. 4D/1, 4D/2,4A/1A/2A, 4A/1A/2E, 4A/1A(pt) of village Hariyali, District Kurla for Chandan Nagar CHS (prop) by M/s. Mahadev Realtors Powai Pvt. Ltd. (Formerly known as- Mahadev Spaceinnovator Private Limited) is a proposed residential project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 3.2 acres.

Who is building it?

The applicant is Mahadev Realtors Powai Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 2 Feb 2026), as of 27 Nov 2026.

Where is it?

In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.

How big is it?

It has a stated cost of ₹894.2 crore and a site of 3.2 acres.

When was it filed?

The application was filed on 30 Jan 2026.

Project details

StatusCleared for impact study
Status since2 Feb 2026
Application filed30 Jan 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantMahadev Realtors Powai Private Limited
UseResidential
Land area3.2 acres (1.3 ha)
Built-up area1,89,251 m² (20,37,079 sq ft)
Project cost₹894.2 crore
Village / localityGreater Mumbai (M Corp.)
Taluk / tehsilMumbai Suburban
DistrictMumbai Suburban
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-14070

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 13 Jun 2026Environmental approval granted3.2 acres₹894.2 crore
Early planning filed 30 Jan 2026 (this page)Cleared for impact study3.2 acres₹894.2 crore

What the filings say

What is planned

Mahadev Realtors Powai Private Limited proposes a Slum Rehabilitation Authority (SRA) scheme at Vikhroli East, Mumbai. The project report states the development will include a rehab building, a sale building with three wings, and a Municipal Administrative Project (MAP) school building. The project has a total construction area of 1,86,497.86 square metres, comprising an FSI area of 88,564.08 square metres and a non-FSI area of 97,933.78 square metres.

Building Configuration

ItemDetail
Total Plot Area13,142.49 sq.m.
Total Construction Area1,86,497.86 sq.m.
Ground Coverage6,701.64 sq.m. (53.97%)
Total Users8,248 persons
Total Water Requirement774 KLD
Sewage Generation731 KLD
Total Solid Waste3,033 kg/day
Connected Power Load17,642 kW

Layout and design

The project site is naturally sloped from the southwest towards the northeast. The master layout shows separate entry and exit points for the rehab building, the sale/commercial building, and the MAP school building. Access is provided via 45.75-metre and 15.25-metre wide roads.

Parking is planned for 1,513 cars and 104 scooters. The design incorporates a 1,020.56 square metre recreation ground (RG) area. Energy conservation measures are expected to save 20.24% of power compared to a conventional base case, with 5.01% of total energy sourced from roof-top solar photovoltaic panels.

Land and surroundings

The site is located in Village Hariyali, Kurla, within a residential zone. It is currently vacant with existing trees. The Sanjay Gandhi National Park is 2.69 km away, and the Thane Flamingo Creek Sanctuary is 1.65 km from the site.

Baseline studies conducted between October and December 2025 identified 47 tree species in the study area. On the project site itself, 24 trees are present; the applicant proposes to retain 14, transplant 8, and cut 2. To compensate, 166 new trees will be planted along with 153 trees in a Miyawaki plantation.

Water, power and access

During the operation phase, the Municipal Corporation of Greater Mumbai (MCGM) will supply 497 KLD of domestic water. The total requirement of 774 KLD includes 271 KLD for flushing and 6 KLD for landscaping. A dual plumbing system will be used to recycle treated sewage for secondary purposes. Four Sewage Treatment Plants (STP) with capacities of 375 KLD, 136 KLD, 252 KLD, and 20 KLD will be installed using Moving Bed Biofilm Reactor (MBBR) technology.

Power will be sourced from Adani Electricity. For backup, the applicant plans to install five Diesel Generator (DG) sets (3 x 625 kVA, 1 x 500 kVA, and 1 x 50 kVA) and five 1,000 kVA transformers.

Environmental safeguards

Solid waste management includes four Organic Waste Converters (OWC) with capacities of 500 kg, 323 kg, 514 kg, and 12 kg per day to treat 1,213 kg/day of biodegradable waste. Non-biodegradable waste (1,820 kg/day) will be handled by authorized vendors.

For fire safety, the project will have underground firefighting tanks totaling 925 cubic metres, a closed-loop hydrant system, and portable extinguishers. Rainwater harvesting and storm water networks are designed to encourage groundwater recharging. The applicant estimated the total carbon footprint during construction at 68,397.55 tCO2e, with an 18% reduction targeted through mitigation measures.

Litigation

Documents filed by the applicant list several pending legal matters, including a writ petition in the High Court for quashing an FIR, a company petition in the NCLT filed by Edelweiss Asset Reconstruction Company, and multiple RERA complaints. There are also ongoing appeals before the SRA CEO and suits in the City Civil Court regarding society registration.

Mahadev Realtors Powai S.R.A Scheme Under 3311 site plan and layout

A drawing from the project's filings. Sign in free to see it.

Mahadev Realtors Powai S.R.A Scheme Under 3311: Master layout: Rehab, Sale, and MAP buildings with road access (preview)🔒 Sign in free to see it
Master layout: Rehab, Sale, and MAP buildings with road access

In context

1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.2 acres, this one is larger than 65% of them.

289 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (3.5 km away).

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.