Environmental approval grantedBuildings & townships · Mumbai Suburban, Maharashtra

Proposed Expansion of Acme boulevard redevelopment project under scheme 33(5) of MCGM DCPR for plot bearing CST no.160A/1(PT) &162(PT) of village Majas Part -1, 163(pt),165(pt) of Village Majas part 2, &170(pt), &170( c ) of village Majas part -3 at (101&109 to 143)Sarvodaya Nagar Mhada layout, Sarvodaya Nagar , Jogeshwari (East), Mumbai 400060 by M/s Acme Realties Pvt. Ltd & two others C.A to owner Majas Wadi Sarvoday Nagar C.H.S ltd

Proposed Expansion of Acme boulevard redevelopment project under scheme 33(5) of MCGM DCPR for plot bearing CST no.160A/1(PT) &162(PT) of village Majas Part -1, 163(pt),165(pt) of Village Majas part 2, &170(pt), &170( c ) of village Majas part -3 at (101&109 to 143)Sarvodaya Nagar Mhada layout, Sarvodaya Nagar , Jogeshwari (East), Mumbai 400060 by M/s Acme Realties Pvt. Ltd & two others C.A to owner Majas Wadi Sarvoday Nagar C.H.S ltd is an approved township project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 8.7 acres. Its stated project cost is ₹950 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 7 Oct 2026).

See it on the live map All projects in Mumbai Suburban

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion of Acme boulevard redevelopment project under scheme 33(5) of MCGM DCPR for plot bearing CST no.160A/1(PT) &162(PT) of village Majas Part -1, 163(pt),165(pt) of Village Majas part 2, &170(pt), &170( c ) of village Majas part -3 at (101&109 to 143)Sarvodaya Nagar Mhada layout, Sarvodaya Nagar , Jogeshwari (East), Mumbai 400060 by M/s Acme Realties Pvt. Ltd & two others C.A to owner Majas Wadi Sarvoday Nagar C.H.S ltd is an approved township project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 8.7 acres.

Who is building it?

The applicant is Acme Realties Private Limited.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 7 Oct 2026), as of 27 Nov 2026.

Where is it?

In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.

How big is it?

It has a stated cost of ₹950 crore and a site of 8.7 acres.

When was it filed?

The application was filed on 29 Jun 2026.

Project details

StatusEnvironmental approval granted
Status since7 Oct 2026
Application filed29 Jun 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorBuildings & townships
ApplicantAcme Realties Private Limited
UseTownship
Land area8.7 acres (3.5 ha)
Built-up area3,02,507 m² (32,56,155 sq ft)
Plot area35,170 m² (3,78,566 sq ft)
Project cost₹950 crore
Village / localityGreater Mumbai (M Corp.)
Taluk / tehsilMumbai Suburban
DistrictMumbai Suburban
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-14075

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 29 Jun 2026 (this page)Environmental approval granted8.7 acres₹950 crore
Early planning filed 29 May 2026Cleared for impact study8.7 acres₹950 crore

What the filings say

What is planned

Acme Realties Private Limited proposes an expansion of the Acme Boulevard redevelopment project, a brownfield residential development under the Maharashtra Housing and Area Development Authority (MHADA) scheme 33(5). The project is located at Sarvodaya Nagar in Jogeshwari (East), Mumbai.

The applicant's project report states that the development will consist of seven buildings in total, categorized into three rehabilitation (Rehab) buildings and four sale buildings. The planned configuration includes:

The total construction area is 2,95,101.02 square metres, with a total plot area of 35,173.44 square metres. The project is designed to accommodate a population of 9,081 persons.

ItemDetail
Total Construction Area2,95,101.02 sq.m
FSI Area1,57,922.82 sq.m
Non-FSI Area1,37,178.21 sq.m
Total Buildings7 (3 Rehab, 4 Sale)
Expected Population9,081 persons
STP Capacity1,120 KLD
Solar PV System350 kW
Total Solid Waste4,411 kg/day

Layout and design

The site layout is divided by an 18.30-metre wide Development Plan (DP) road. The proposed design incorporates recreational ground (RG) areas at both the ground level and on podiums. According to the coordinated layout, the buildings are arranged around central open spaces and internal driveways. The project includes basement and podium levels for parking and utilities. Fire tender movement is planned around the periphery of the building clusters.

Land and surroundings

The project site is situated in a highly urbanized residential zone under the jurisdiction of the Municipal Corporation of Greater Mumbai (MCGM) and MHADA. Baseline studies conducted between October and December 2025 indicate the surrounding land use is 55% built-up area.

Environmentally sensitive areas in the vicinity include:

The site is largely flat with minor elevation variations of 1 to 2 metres. Soil testing revealed the presence of fill material, black soil, and weathered basalt. While soil samples showed high organic content, they also indicated moderate alkalinity.

Water, power and access

Water: The total water requirement for the project is estimated at 1,200 kilolitres per day (KLD). The applicant intends to source 783 KLD of fresh water from the Municipal Corporation, while the remaining 395 KLD for flushing and 22 KLD for landscaping will be met through treated water from an on-site Sewage Treatment Plant (STP). The STP will have a capacity of 1,120 KLD using Moving Bed Biofilm Reactor (MBBR) technology.

Power: The operational power requirement is estimated at 350 kW. The applicant proposes to install a solar photovoltaic (PV) system to provide approximately 5% energy savings. For emergency backup, diesel generator (DG) sets are planned.

Access: The site is connected via the Western Express Highway (WEH) and the Jogeshwari–Vikhroli Link Road (JVLR). Internal access is provided by 6.00-metre wide driveways and the existing DP roads.

Environmental safeguards

The Environmental Management Plan (EMP) includes a capital budget of ₹36.62 crore and an annual operating budget of ₹1.89 crore. Key measures include:

Timeline

The project is a brownfield expansion. Construction status reports indicate that some rehab buildings (R1, R2, R3) and portions of sale buildings (S4, S5) have seen prior activity under earlier approvals. The current proposal seeks an amendment for the expanded built-up area.

Expansion of Acme Boulevard Redevelopment Project Under Scheme 335 of MCGM DCPR for Plot Bearing CST No.160A/1PT &162PT of Village Majas Part -1, 163pt,165pt of Village Majas Part 2, &170pt, &170c of Village Majas Part -3 at (101&109 to 143)Sarvodaya Nagar Mhada Layout, Sarvodaya Nagar , Jogeshwari East, Mumbai 400060 site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Expansion of Acme Boulevard Redevelopment Project Under Scheme 335 of MCGM DCPR for Plot Bearing CST No.160A/1PT &162PT of Village Majas Part -1, 163pt,165pt of Village Majas Part 2, &170pt, &170c of Village Majas Part -3 at (101&109 to 143)Sarvodaya Nagar Mhada Layout, Sarvodaya Nagar , Jogeshwari East, Mumbai 400060: Proposed Project Layout: arrangement of rehab and sale buildings (preview)🔒 Sign in free to see it
Proposed Project Layout: arrangement of rehab and sale buildings
Expansion of Acme Boulevard Redevelopment Project Under Scheme 335 of MCGM DCPR for Plot Bearing CST No.160A/1PT &162PT of Village Majas Part -1, 163pt,165pt of Village Majas Part 2, &170pt, &170c of Village Majas Part -3 at (101&109 to 143)Sarvodaya Nagar Mhada Layout, Sarvodaya Nagar , Jogeshwari East, Mumbai 400060: Building sections for Sale Towers 1, 2, and 3 showing floor heights (preview)🔒 Sign in free to see it
Building sections for Sale Towers 1, 2, and 3 showing floor heights
Expansion of Acme Boulevard Redevelopment Project Under Scheme 335 of MCGM DCPR for Plot Bearing CST No.160A/1PT &162PT of Village Majas Part -1, 163pt,165pt of Village Majas Part 2, &170pt, &170c of Village Majas Part -3 at (101&109 to 143)Sarvodaya Nagar Mhada Layout, Sarvodaya Nagar , Jogeshwari East, Mumbai 400060: Water Balance Chart: daily fresh and recycled water requirements (preview)🔒 Sign in free to see it
Water Balance Chart: daily fresh and recycled water requirements
Expansion of Acme Boulevard Redevelopment Project Under Scheme 335 of MCGM DCPR for Plot Bearing CST No.160A/1PT &162PT of Village Majas Part -1, 163pt,165pt of Village Majas Part 2, &170pt, &170c of Village Majas Part -3 at (101&109 to 143)Sarvodaya Nagar Mhada Layout, Sarvodaya Nagar , Jogeshwari East, Mumbai 400060: Coordinated layout: location of STP, OWC, and utility tanks (preview)🔒 Sign in free to see it
Coordinated layout: location of STP, OWC, and utility tanks

In context

1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 8.7 acres, this one is larger than 83% of them.

532 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (8.8 km away).