Quick answers
What is this project?
Proposed Expansion of SRA Scheme under Reg. 33 (10) of DCPR 2034 on land bearing CTS. No 134, 134/1 to 25, 135, 135/1to 12, 136, 136/1 to 38, 137, 137/1 & Non-Slum Plot bearing CTS No 586(pt),738B/1A(pt) of village Dindoshi, at Pathanwadi, Malad (East), Mumbai by M/s. Bahist Enterprises Private Limited is a proposed residential project in Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The site covers 9.3 acres.
Who is building it?
The applicant is M/S. Bahist Enterprises PVT. LTD..
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 17 Jul 2026), as of 27 Nov 2026.
Where is it?
In Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra.
How big is it?
It has a stated cost of ₹864.3 crore and a site of 9.3 acres.
When was it filed?
The application was filed on 29 Jun 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 17 Jul 2026 |
| Application filed | 29 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | M/S. Bahist Enterprises PVT. LTD. |
| Use | Residential |
| Land area | 9.3 acres (3.8 ha) |
| Built-up area | 2,93,591 m² (31,60,184 sq ft) |
| Project cost | ₹864.3 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Mumbai Suburban |
| District | Mumbai Suburban |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14121 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 25 Aug 2026 | Under environmental review | 9.3 acres | ₹864.3 crore |
| Early planning filed 29 Jun 2026 (this page) | Cleared for impact study | 9.3 acres | ₹864.3 crore |
What the filings say
What is planned
The applicant, M/s. Bahist Enterprises Private Limited, proposes the expansion of a Slum Rehabilitation Authority (SRA) scheme in Malad (East). The project is a brownfield development that previously received environmental clearance for a violation in February 2024. The current expansion increases the total construction area to 2,93,590.84 square metres, of which 97,226.49 square metres has already been constructed.
The project consists of 16 buildings in total, including 10 existing structures and 6 new or revised buildings. The residential component includes 1,964 rehab flats and 2,085 sale flats. Commercial and community spaces include 240 shops, 9 offices, 56 amenity units, and two mosques.
Building Configuration
| Building | Configuration | Height (m) |
|---|---|---|
| Rehab Building 1A | Basement + Gr/St + 2 Podiums + 40 Floors | 119.90 |
| Composite Building 2A | Basement + Gr/St + 6 Podiums + 39 Floors | 119.95 |
| Sale Building 3A | Basement + Gr/St + 6 Podiums + 39 Floors | 119.95 |
| Sale Building 4A | LG + UG + 5 Podiums + E-Deck + 37 Floors | 119.95 |
| Sale Building 5A | Gr/St + 39 Floors | 119.00 |
| Building 28 | Gr + 22 Floors | 68.30 |
| Composite Building 20 | Gr + Lower Gr + 22 Floors | 68.05 |
| Composite Building 29 | G + 22 Floors | 67.45 |
| Rehab Building 30 | G + 23 Floors | 69.90 |
| Sale Building 39 | G + 22 Floors | 67.85 |
Other existing structures include Composite Building 25 (up to 10 floors), Composite Building 24 (7 floors), Sale Building 21 (13 floors), Sale Building 33 (7 floors), and two mosques of 3 floors each.
Layout and design
The project is designed with a total plot area of 3.76 hectares (9.29 acres). The layout includes internal access roads ranging from 9.15 metres to 12.20 metres in width, connecting to an existing 18.30-metre wide development plan road. The design incorporates a total of 1,167 four-wheeler and 194 two-wheeler parking spaces. A dedicated parking tower of 69.30 metres is planned for Building 5A.
Land and surroundings
The site is located at Pathanwadi, Malad (East), at the foothills of the Sanjay Gandhi National Park (SGNP). According to a distance certificate from the Thane Forest Division, the project boundary is 187 metres from the SGNP boundary and 39 metres from its Eco-Sensitive Zone (ESZ). The land is situated in a residential zone. The topography shows minor undulations with a 9-metre difference between the highest and lowest points; the applicant plans to fill and raise the plot to match the level of the existing development plan road.
Water, power and access
The total water requirement is estimated at 2,188 kilolitres per day (KLD) during the non-monsoon season. Fresh water of 1,439 KLD will be sourced from the Brihanmumbai Municipal Corporation (BMC). The remaining 750 KLD for flushing and landscaping will be provided by on-site treated water.
Power will be supplied by Tata or Adani Power, with a connected load of 28,868 KW and a maximum demand of 10,447 KW. Six diesel generator sets (ranging from 250 KVA to 500 KVA) are proposed for emergency backup. Access to the site is provided via Rani Sati Road and General Arun Kumar Vaidya Marg.
Environmental safeguards
The applicant proposes a Sewage Treatment Plant (STP) using Moving Bed Biofilm Reactor (MBBR) technology with a total capacity of 2,180 KLD. For solid waste, an Organic Waste Converter (OWC) will treat 4,788 kg/day of biodegradable waste to produce manure for landscaping. Non-biodegradable waste (3,359 kg/day) will be sent to authorised recyclers.
Green initiatives include:
- Landscaping: 2,755.85 square metres of recreational open space, including Miyawaki forestation.
- Rainwater Harvesting: Tanks with a total capacity of 324 KLD.
- Solar Energy: Solar photovoltaic panels are expected to provide 5% energy savings.
- Electric Vehicles: Provision for charging stations in at least 30% of the parking area.
Bahist Enterprises Expansion of SRA Scheme Under Reg. 33 10 of DCPR 2034 on Land site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,858 applications in Mumbai Suburban since January 2022 are in the same category (Buildings & townships): 1,230 approved, 196 filed or under review, and 432 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 9.3 acres, this one is larger than 84% of them.
554 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Mumbai Suburban, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Adani’s ₹7,514 Crore Dharavi Redevelopment: 47,076 Homes Planned in Major Mumbai Project (9.6 km away).
Other projects nearby
- Proposed Expansion of SRA Scheme under Reg. 33 (10) of DCPR 2034 on land… — under environmental review, 0 m away
- Proposed SRA Scheme Project on land bearing CTS.No 134, 134/1 to 25, 135,… — cleared for impact study, 0 m away
- Proposed SRA Scheme Project on land bearing CTS.No 134, 134/1 to 25, 135,… — cleared for impact study, 50 m away
- Proposed SRA Scheme Project on land bearing CTS.No 134, 134/1 to 25, 135,… — environmental approval granted, 50 m away
- Residential Project under the Slum Rehabilitation Scheme for 'Rahila Park… — environmental approval granted, 150 m away
- Proposed Joint redevelopment of existing chawl no 1 to 3 known as Dindoshi… — environmental approval granted, 200 m away
- Proposed Joint redevelopment of existing chawl no 1 to 3 known as Dindoshi… — lapsed, 200 m away
- Proposed Building and construction project at CTS No 146 & 147 (Pt.) Shivdham… — environmental approval granted, 300 m away
More from M/S. Bahist Enterprises PVT. LTD. in Mumbai Suburban
- Proposed SRA Scheme Project on land bearing CTS.No 134, 134/1 to 25, 135,… — cleared for impact study
- Proposed SRA Scheme Project on land bearing CTS.No 134, 134/1 to 25, 135,… — environmental approval granted
- Proposed SRA Scheme Project on land bearing CTS.No 134, 134/1 to 25, 135,… — cleared for impact study
- Proposed SRA Scheme Project on land bearing CTS.No 134, 134/1 to 25, 135,… — cleared for impact study
All 6 Bahist Enterprises projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.