Ghosla Pumped Storage Hydro Electric Project

Ghosla Pumped Storage Hydro Electric Project is a withdrawn water and irrigation project in Anjola, Soegaon, Aurangabad, Maharashtra. The site covers 3,988.1 acres. Its stated project cost is ₹10,669.3 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 31 Aug 2026).

See it on the live map All projects in Aurangabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusWithdrawn
Status since31 Aug 2026
Application filed31 Aug 2026
Approval soughtEnvironmental approval
Application typeAmendment
SectorWater & irrigation
ApplicantMegha Engineering & infrastructures Limited
Land area3,988.1 acres (1,613.9 ha)
Project cost₹10,669.3 crore
Village / localityAnjola
Taluk / tehsilSoegaon
DistrictAurangabad
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-14209

In context

14 applications in Aurangabad since January 2022 are in the same category (Water & irrigation): 2 approved, 7 filed or under review, and 5 withdrawn, lapsed or rejected. At 3,988.1 acres, this one is larger than 54% of them.

Where it is

Anjola, Soegaon, Aurangabad, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Megha Engineering & infrastructures Limited in Aurangabad

3 Megha Engineering & projects in Aurangabad
All 8 Megha Engineering & projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.