Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 3 Jul 2026 |
| Application filed | 3 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Buildings & townships |
| Applicant | Indiabulls Infraestate Limited |
| Use | Other |
| Land area | 1.9 acres (0.8 ha) |
| Project cost | ₹980 crore |
| Village / locality | Greater Mumbai (M Corp.) |
| Taluk / tehsil | Greater Mumbai |
| District | Mumbai |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14325 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 3 Apr 2026 (this page) | Environmental approval granted | 1.9 acres | ₹980 crore |
| Ownership transfer filed 5 Dec 2025 | Environmental approval granted | 1.9 acres | ₹980 crore |
| Expansion filed 13 Sept 2025 | Environmental approval granted | 1.9 acres | ₹980 crore |
| Early planning filed 5 Jul 2025 | Cleared for impact study | 1.9 acres | ₹980 crore |
In context
583 applications in Mumbai since January 2022 are in the same category (Buildings & townships): 446 approved, 58 filed or under review, and 79 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1.9 acres, this one is smaller than 52% of them.
455 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Greater Mumbai (M Corp.), Greater Mumbai, Mumbai, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Joint Development Layout (redevelopment project) On Plot… — environmental approval granted, 0 m away
- Proposed Expansion of Joint Development Layout (redevelopment project) On Plot… — environmental approval granted, 0 m away
- Proposed Expansion of Joint Development Layout (redevelopment project) On Plot… — cleared for impact study, 0 m away
- Application for EC for the proposed Construction of underground and Elevated… — environmental approval granted, 150 m away
- Application of EC (along with Consent to Establish as per MoEF & CC… — environmental approval granted, 150 m away
- Tata Motors Limited Corporate Headquarters at Collectorate's new number 12182,… — more information requested, 200 m away
- Proposed development redevelopment on subdivided plot no.5A bearing C.S.No.… — cleared for impact study, 250 m away
- Proposed Amended EC for Development on subdivided plot no.5A bearing C.S. No.… — cleared for impact study, 250 m away
All 4 Indiabulls Infraestate projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.