What is Savitri Pumped Storage Project (2400 MW)?
Savitri Pumped Storage Project (2400 MW) is a proposed water and irrigation project in Dabhil, Poladpur, Raigarh, Maharashtra. The site covers 767.9 acres.
Who is building it?
The applicant is Nhpc Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Dabhil, Poladpur, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹11,826 crore; a site of 767.9 acres and 137.5 acres (55.6 ha) of forest land.
When was it filed?
The application was filed on 2 Sept 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 28 Sept 2026 |
| Application filed | 2 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Nhpc Limited |
| Land area | 767.9 acres (310.8 ha) |
| Forest land | 137.5 acres (55.6 ha) |
| Project cost | ₹11,826 crore |
| Village / locality | Dabhil |
| Taluk / tehsil | Poladpur |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14429 |
In context
31 applications in Raigarh since January 2022 are in the same category (Water & irrigation): 11 approved, 14 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 767.9 acres, this one is smaller than 60% of them.
Where it is
Dabhil, Poladpur, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Savitri Pumped Storage Project (2400 MW) — cleared for impact study, 250 m away
- Environment Clearance for proposed development of residential buildings under… — environmental approval granted, 15.8 km away
- Proposed greenfield project for manufacturing of Specialty Chemicals at Plot… — cleared for impact study, 19.3 km away
- Proposed greenfield project for manufacturing of Specialty Chemicals at Plot… — withdrawn, 19.3 km away
- Synthetic Organic Chemicals, Hydrogen, Inorganic and Blending & Formulation… — environmental approval granted, 19.6 km away
- Synthetic Organic Chemicals, Hydrogen, Inorganic and Blending & Formulation… — cleared for impact study, 19.6 km away
- Pesticides, Pesticides Intermediates, Synthetic Organic Chemicals, Hydrogen,… — returned to applicant, 19.6 km away
- Pesticides, Pesticides Intermediates, Synthetic Organic Chemicals, Hydrogen,… — cleared for impact study, 19.6 km away
More from Nhpc Limited in Raigarh
- Savitri Pumped Storage Project (2400 MW) — cleared for impact study
All 25 Nhpc projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.