What is Developing? Open the mapMap

LapsedTelecom · Washim, Maharashtra

Diversion of Forest Land for Laying Underground Optical Fiber Cable Within Row of Existing Road of Risod-Hingoli-Lonar

Diversion of Forest Land for Laying Underground Optical Fiber Cable Within Row of Existing Road of Risod-Hingoli-Lonar is a lapsed telecom project in Risod, Washim, Maharashtra. The site covers 431.3 acres. Its stated project cost is ₹12 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 9 Feb 2025).

See it on the live map All projects in Washim

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of Forest Land for Laying Underground Optical Fiber Cable Within Row of Existing Road of Risod-Hingoli-Lonar is a lapsed telecom project in Risod, Washim, Maharashtra. The site covers 431.3 acres.

Who is building it?

The applicant is Arcsons Infratech Private Limited.

Has it been approved?

No. The application was lapsed on 9 Feb 2025, so it is no longer under consideration.

Where is it?

In Risod, Washim, Maharashtra.

How big is it?

It has a stated cost of ₹12 lakh; a site of 431.3 acres and 1,140 m² of forest land.

When was it filed?

The application was filed on 28 Nov 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of Forest Land for Laying Underground Optical Fiber Cable Within Row of…

Project details

Official titleProposal for Diversion of Forest Land for Laying Underground Optical Fiber Cable Within Row of Existing Road of Risod-Hingoli-Lonar in District Washim in the State of Maharashtra.
StatusLapsed
Status since9 Feb 2025
Application filed28 Nov 2024
Approval soughtForest land use
Application typeNew project
SectorTelecom
ApplicantArcsons Infratech Private Limited
Land area431.3 acres (174.5 ha)
Forest land1,140 m²
Project cost₹12 lakh
Village / localityRisod
Taluk / tehsilRisod
DistrictWashim
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-14441

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Change of use filed 26 Feb 2025Forest land use approved431.3 acres₹12 lakh
New project filed 28 Nov 2024 (this page)Lapsed431.3 acres₹12 lakh

In context

23 applications in Washim since January 2022 are in the same category (Telecom): 1 approved, 12 filed or under review, and 10 withdrawn, lapsed or rejected. At 431.3 acres, this one is larger than 50% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Risod, Washim, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Arcsons Infratech Private Limited in Washim

3 Arcsons Infratech projects in Washim
All 7 Arcsons Infratech projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.