Rehabilitation and Upgradation of Shewali(Sakri)-Nandurbar section of NH-753B from Km.0/000 to Km.49.050 (excluding Km.0.300 to Km. 4.500 & Km.13.485 to Km.23.975 (Design Chainage) of Two Lane with Paved shoulder configuration and additional bridge works at Km. 13.915 (60m), & Km. 19.845 (70m) on EPC mode in the State of Maharashtra (Section from CH.11 400 to CH. 11 800, CH 12 240 to CH 12 760 and CH. 16 760 to CH. 17 900)

Rehabilitation and Upgradation of Shewali(Sakri)-Nandurbar section of NH-753B from Km.0/000 to Km.49.050 (excluding Km.0.300 to Km. 4.500 & Km.13.485 to Km.23.975 (Design Chainage) of Two Lane with Paved shoulder configuration and additional bridge works at Km. 13.915 (60m), & Km. 19.845 (70m) on EPC mode in the State of Maharashtra (Section from CH.11 400 to CH. 11 800, CH 12 240 to CH 12 760 and CH. 16 760 to CH. 17 900) is a proposed road project in Bhamer, Sakri, Dhule, Maharashtra. The site covers 14.3 acres. Its stated project cost is ₹232.6 crore. As of 27 Nov 2026, its status is “Initial checks” (since 4 Sept 2026).

See it on the live map All projects in Dhule

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Rehabilitation and Upgradation of Shewali(Sakri)-Nandurbar section of NH-753B from Km.0/000 to Km.49.050 (excluding Km.0.300 to Km. 4.500 & Km.13.485 to Km.23.975 (Design Chainage) of Two Lane with Paved shoulder configuration and additional bridge works at Km. 13.915 (60m), & Km. 19.845 (70m) on EPC mode in the State of Maharashtra (Section from CH.11 400 to CH. 11 800, CH 12 240 to CH 12 760 and CH. 16 760 to CH. 17 900) is a proposed road project in Bhamer, Sakri, Dhule, Maharashtra. The site covers 14.3 acres.

Who is building it?

The applicant is Ministry of Road Transport & Highways.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Bhamer, Sakri, Dhule, Maharashtra.

How big is it?

It has a stated cost of ₹232.6 crore; a site of 14.3 acres and 11.8 acres (4.8 ha) of forest land.

When was it filed?

The application was filed on 7 Aug 2024.

Project details

StatusInitial checks
Status since4 Sept 2026
Application filed7 Aug 2024
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantMinistry of Road Transport & Highways
Land area14.3 acres (5.8 ha)
Forest land11.8 acres (4.8 ha)
Project cost₹232.6 crore
Village / localityBhamer
Taluk / tehsilSakri
DistrictDhule
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-14518

In context

6 applications in Dhule since January 2022 are in the same category (Roads & highways): 1 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.

Where it is

Bhamer, Sakri, Dhule, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.