Quick answers
What is this project?
Laying Underground Optical Fiber Cable along the road in ROW of ODR-68 and MDR 26 from Somanpalli to Konjed Route is a proposed telecom project in Reserved Forest, Sironcha, Gadchiroli, Maharashtra. It seeks 3.4 acres of forest land.
Who is building it?
The applicant is Vedant Empire Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Reserved Forest, Sironcha, Gadchiroli, Maharashtra.
How big is it?
It has a stated cost of ₹42 lakh and 3.4 acres (1.4 ha) of forest land.
When was it filed?
The application was filed on 2 May 2023.
Project details
| Official title | Laying Underground Optical Fiber Cable along the road in ROW of ODR-68 and MDR 26 from Somanpalli to Konjed Route in Sironcha Tehsil of Dist. Gadchiroli. |
|---|---|
| Status | More information requested |
| Status since | 5 Dec 2024 |
| Application filed | 2 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Vedant Empire Private Limited |
| Forest land | 3.4 acres (1.4 ha) |
| Project cost | ₹42 lakh |
| Village / locality | Reserved Forest |
| Taluk / tehsil | Sironcha |
| District | Gadchiroli |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14622 |
In context
40 applications in Gadchiroli since January 2022 are in the same category (Telecom): 0 approved, 27 filed or under review, and 13 withdrawn, lapsed or rejected.
Where it is
Reserved Forest, Sironcha, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- USFO Kistyaplli MAHUSO184 — lapsed, 6.4 km away
- Laying Underground Optical Fibre Cable along the road in ROW of MDR-28 on… — more information requested, 6.6 km away
- Usof Mahuso008 — lapsed, 11.3 km away
- Environmental Clearance for Proposed River Bed Sand Mining Having Lease Area… — environmental approval granted, 15.3 km away
- Environmental Clearance for Proposed River Bed Sand Mining Having Lease Area… — environmental approval granted, 16 km away
- Laying Underground Optical Fiber Cable along the road in ROW of NH-59 from… — more information requested, 16.9 km away
- Environmental Clearance for Proposed River Bed Sand Mining Having Lease Area… — environmental approval granted, 19.6 km away
- Environmental Clearance for Proposed River Bed Sand Mining Having Lease Area… — environmental approval granted, 19.8 km away
More from Vedant Empire Private Limited in Gadchiroli
- Laying Underground Optical Fiber Cable along the road in ROW of NH-59 from… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.