Quick answers
What is this project?
Re-Diversion of Forest Land under Van (Sanrakshan Evam Sanvardhan) Adhiniyam, 1980 for Laying Underground Optical Fiber Cable along the Road is a lapsed telecom project in Pandharewadi, Shrigonda, Ahmadnagar, Maharashtra. It seeks 0.2 acres of forest land.
Who is building it?
The applicant is Bharti Airtel Limited.
Has it been approved?
No. The application was lapsed on 26 Feb 2026, so it is no longer under consideration.
Where is it?
In Pandharewadi, Shrigonda, Ahmadnagar, Maharashtra.
How big is it?
It has a stated cost of ₹15 lakh and 630 m² of forest land.
When was it filed?
The application was filed on 21 Dec 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Re-Diversion of Forest Land under Van (Sanrakshan Evam Sanvardhan) Adhiniyam, 1980 for…
Project details
| Official title | Re-Diversion of Forest Land under Van (Sanrakshan Evam Sanvardhan) Adhiniyam, 1980 for Laying Underground Optical Fiber Cable along the Road in RoW of NH-160 from village Chikhali to Pandharewadi in Shrigonda Tehsil of Dist. Ahilyanagar in State of Maharashtra |
|---|---|
| Status | Lapsed |
| Status since | 26 Feb 2026 |
| Application filed | 21 Dec 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Bharti Airtel Limited |
| Forest land | 630 m² |
| Project cost | ₹15 lakh |
| Village / locality | Pandharewadi |
| Taluk / tehsil | Shrigonda |
| District | Ahmadnagar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14653 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 21 Dec 2025 (this page) | Lapsed | ₹15 lakh | |
| New project filed 11 Aug 2025 | More information requested | 0.6 acres | ₹15 lakh |
In context
23 applications in Ahmadnagar since January 2022 are in the same category (Telecom): 2 approved, 5 filed or under review, and 16 withdrawn, lapsed or rejected.
Where it is
Pandharewadi, Shrigonda, Ahmadnagar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-Diversion of Forest Land under Van (Sanrakshan Evam Sanvardhan) Adhiniyam,… — lapsed, 0 m away
- Re-Diversion of Forest Land under Van (Sanrakshan Evam Sanvardhan) Adhiniyam,… — more information requested, 300 m away
- Doubling of Ranjangaon to Sarola section of Daund-Manmad existing BG Railway… — more information requested, 6.2 km away
- Proposed Sakalai Lift Irrigation Scheme — under environmental review, 6.3 km away
- Environmental Clearance for the stone quarry of Shri. Vijay Uttam Thokal &… — environmental approval granted, 7.1 km away
- Mr. Ashok Laxman Kotkar — environmental approval granted, 7.5 km away
- Shri. Aaditya Aabasaheb Ghodake, Shri. Kiran Pandhrinath Bhos, Shri. Prabhakar… — environmental approval granted, 7.7 km away
- Gundegaon Regional Rural Water Supply Scheme Tal. Nagar Under Jal Jeevan… — lapsed, 8.2 km away
More from Bharti Airtel Limited in Ahmadnagar
- Diversion Of Forest Land Laying Underground OFC along the Existing Right Of… — in-principle approval, conditions pending
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — under forest review
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — forest land use approved
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable along… — forest land use approved
- Diversion of Forest Land for Laying of Underground Ofc Duct and Cable to M/S… — more information requested
- Diversion Of Forest Land Laying Underground OFC along the Existing Right Of… — lapsed
9 Bharti Airtel (Airtel) projects in Ahmadnagar
All 485 Bharti Airtel (Airtel) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.