One of 2 filings for this project. The project's main page, with every filing and where each stands: New Pipe Water Supply Scheme at Tilmal Fanasgaon Tal-Wada
Project details
| Status | Lapsed |
|---|---|
| Status since | 1 Nov 2023 |
| Application filed | 3 Aug 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Water & irrigation |
| Applicant | Rural Development |
| Land area | 82,503.9 acres (33,388.2 ha) |
| Forest land | 2,550 m² |
| Project cost | ₹1.8 crore |
| Village / locality | Tilmal |
| Taluk / tehsil | Vada |
| District | Palghar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14674 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 3 Aug 2023 (this page) | Lapsed | 82,503.9 acres | ₹1.8 crore |
| New project filed 24 Jul 2023 | More information requested | 82,503.9 acres | ₹1.8 crore |
In context
16 applications in Palghar since January 2022 are in the same category (Water & irrigation): 1 approved, 8 filed or under review, and 7 withdrawn, lapsed or rejected. At 82,503.9 acres, this one is larger than 73% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tilmal, Vada, Palghar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Retrofitting of Pipe Water Supply Scheme at Pachghar Tal-Wada — lapsed, 0 m away
- New Pipe Water Supply Scheme at Tilmal Fanasgaon Tal-Wada — more information requested, 0 m away
- Retrofitting of Pipe Water Supply Scheme at Pachghar Tal-Wada — more information requested, 0 m away
- Piped Water Supply Scheme at Koshimbade — application filed, 0 m away
- Saint Gobain India Private Limited Gyproc for Upgrading the Capacity of Some… — more information requested, 350 m away
- Saint Gobain India Private Limited Gyproc for Upgrading the Capacity of Some… — more information requested, 350 m away
- Gargai Dam Project — lapsed, 2.3 km away
- Gargai Dam Project — under wildlife review, 2.3 km away
More from Rural Development in Palghar
- Laying of Drinking Water Pipeline — more information requested
- New Pipe water supply scheme at Pimparoli Tal-Wada — lapsed
- Retrofitting of Pipe Water Supply Scheme at Pachghar Tal-Wada — lapsed
- Retrofitting of Pipe Water Supply Scheme at Tivari Tal-Vasai — lapsed
- Retrofitting of Pipe Water Supply Scheme at Pachghar Tal-Wada — more information requested
- New Pipe water supply scheme at Pimparoli Tal-Wada — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.