What is this project?
5-MW Solar Plant MSKVY 2.0 at Wai (33/11 KV TiwariSubstation) is a lapsed power project in Tiwari, Digras, Yavatmal, Maharashtra. The site covers 10.4 acres.
Who is building it?
The applicant is Avaada Clean Project Private Limited.
Has it been approved?
No. The application was lapsed on 3 Jan 2026, so it is no longer under consideration.
Where is it?
In Tiwari, Digras, Yavatmal, Maharashtra.
How big is it?
It has a stated cost of ₹21 crore; a site of 10.4 acres and 2.6 acres (1 ha) of forest land.
When was it filed?
The application was filed on 25 Sept 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 3 Jan 2026 |
| Application filed | 25 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Avaada Clean Project Private Limited |
| Land area | 10.4 acres (4.2 ha) |
| Forest land | 2.6 acres (1 ha) |
| Project cost | ₹21 crore |
| Village / locality | Tiwari |
| Taluk / tehsil | Digras |
| District | Yavatmal |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14712 |
In context
5 applications in Yavatmal since January 2022 are in the same category (Power): 0 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tiwari, Digras, Yavatmal, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-diversion forest land for laying underground Optical fiber cable of… — forest land use approved, 2.6 km away
- Diversion of forest land for laying Underground Optical Fiber Cable within RoW… — lapsed, 3.7 km away
- Re-diversion of forest land in favour of Vodafone Idea Telecom Infrastructure… — lapsed, 10.2 km away
- SAWANGA KHURD SAND GHAT TQ DIGRAS DIST YAVATMAL OVER RIVER ARUNAWATI AREA… — environmental approval granted, 11.5 km away
- Re-Diversion of Forest Land in Favour of Vodafone Idea Telecom Infrastructure… — lapsed, 11.8 km away
- Stone quarry proposal of Mr. Ankit Suresh Gandhi ,Vill. Bagwadi, Tq Darwha… — environmental approval granted, 13.6 km away
- Stone quarry proposal of Mr. Gopal Omkarmal Mor ,Vill. Bagwadi, Tq Darwha… — environmental approval granted, 14 km away
- Diversion of forest Land Laying Underground OFC along the existing Right of… — forest land use approved, 14.4 km away
More from Avaada Clean Project Private Limited in Yavatmal
- 6-MW Solar Plant MSKVY 2.0 at Dhanorakh (33/11 KVKalgaon Substation) — lapsed
- 6-MW Solar Plant MSKVY 2.0 at Nababpur (33/11 KV Ner Substation) — lapsed
- 7-MW Solar Plant MSKVY 2.0 at Undarni (33/11KV Shiroli Substation) — lapsed
4 Avaada Clean Project projects in Yavatmal
All 10 Avaada Clean Project projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.