Project details
| Official title | Proposal for Diversion of Forest Land for Laying of Underground Ofc Duct and Cable Within the Row of Existing Road Passing Through Forest Land at Village- Yawat, Malshiras and Korhale Bk Tal- Daund, Saswad and Baramati Dist- Pune |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 25 Jul 2025 |
| Application filed | 14 Oct 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Buildings & townships |
| Applicant | P2p Networks Private Limited |
| Use | Other |
| Land area | 2.2 acres (0.9 ha) |
| Forest land | 2.1 acres (0.9 ha) |
| Plot area | 8,700 m² (93,646 sq ft) |
| Project cost | ₹6 lakh |
| Village / locality | Korhale Bk. |
| Taluk / tehsil | Baramati |
| District | Pune |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14790 |
In context
3,029 applications in Pune since January 2022 are in the same category (Buildings & townships): 2,001 approved, 415 filed or under review, and 613 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.2 acres, this one is smaller than 75% of them.
Where it is
Korhale Bk., Baramati, Pune, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri. Sunil Namdev Dighe — environmental approval granted, 7.5 km away
- Diversion of Forest Land for Laying Underground Pipeline Under Supe Rrwss — lapsed, 8.6 km away
- Diversion of Forest Land for Laying of Underground Ofc Duct & Cable Within Row… — lapsed, 8.7 km away
- Mr. Lalasaheb Eknath Nalawade — not approved, 8.7 km away
- Mining project by M/s – Jagdamb Stone Crusher Tarafe Partner, Mr. Viraj Dadaso… — environmental approval granted, 8.8 km away
- Laying of Optical Fibre Cable (OFC) along existing Right of Way of the Roads… — lapsed, 9.2 km away
- Diversion of Forest Land for Laying Underground Water Pipeline for Agriculture… — lapsed, 9.3 km away
- Diversion of 0.0465 Ha. Reserved Forest for Laying Underground Water Pipeline… — in-principle approval, conditions pending, 9.3 km away
All 11 P2p Networks projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.