Quick answers
What is this project?
Re-diversion forest land for laying of Optical fiber cable of Vodafone Idea Telecom Infrastructure Ltd Project along the ROW of Shirpur To Khetiya is a lapsed telecom project in Dahivad, Shirpur, Dhule, Maharashtra. It seeks 1 acre of forest land.
Who is building it?
The applicant is Vodafone Idea Telecom Infrastructure Limited.
Has it been approved?
No. The application was lapsed on 21 Oct 2026, so it is no longer under consideration.
Where is it?
In Dahivad, Shirpur, Dhule, Maharashtra.
How big is it?
It has a stated cost of ₹10 lakh and 1 acres (0.4 ha) of forest land.
When was it filed?
The application was filed on 18 Jul 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Re-diversion forest land for laying of Optical fiber cable of Vodafone Idea Telecom…
Project details
| Official title | Proposal for re-diversion forest land for laying of Optical fiber cable of Vodafone Idea Telecom Infrastructure Ltd Project along the ROW of Shirpur To Khetiya in Dhule District under Dhule Forest Division. In the state of Maharashtra. |
|---|---|
| Status | Lapsed |
| Status since | 21 Oct 2026 |
| Application filed | 18 Jul 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Vodafone Idea Telecom Infrastructure Limited |
| Forest land | 1 acres (0.4 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Dahivad |
| Taluk / tehsil | Shirpur |
| District | Dhule |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-14793 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 19 Feb 2026 | Under forest review | ₹25 lakh | |
| Change of use filed 18 Jul 2025 (this page) | Lapsed | ₹10 lakh |
In context
11 applications in Dhule since January 2022 are in the same category (Telecom): 0 approved, 3 filed or under review, and 8 withdrawn, lapsed or rejected.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dahivad, Shirpur, Dhule, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-diversion forest land for laying of Optical fiber cable of M/s. Dinesh… — more information requested, 3.4 km away
- Constructing Two room zilla parishad marathi school building — more information requested, 4 km away
- Constructing Two room zilla parishad marathi school building — lapsed, 4 km away
- Constructing Two room zilla parishad marathi school building — withdrawn, 4 km away
- Constructing Two room zilla parishad marathi school building — lapsed, 4 km away
- Constructing Two room zilla parishad marathi school building — withdrawn, 4 km away
- Constructing Two Room Zilla Parishad Marathi School Building — under wildlife review, 4.7 km away
- Constructing Two Room Zilla Parishad Marathi School Building — withdrawn, 4.7 km away
More from Vodafone Idea Telecom Infrastructure Limited in Dhule
- Re-diversion forest land for laying of Optical fiber cable of Vodafone Idea… — lapsed
- Re-diversion forest land for laying of Optical fiber cable of Vodafone Idea… — lapsed
- Re-diversion forest land for laying of Optical fiber cable of Vodafone Idea… — lapsed
5 Vodafone Idea Telecom projects in Dhule
All 71 Vodafone Idea Telecom projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.