LapsedRoads & highways · Gadchiroli, Maharashtra

Diversion of 2.98 Ha. of Forest Land for Rehabilitation, Upgradation & Widening of existing Highway to 2 Lane / 4 Lane with Paved Shoulder from Km. 55/800 to Km. 113/650 (Length = 57.850 Km.) on NH 353C from Soni Village to Gadchiroli

Diversion of 2.98 Ha. of Forest Land for Rehabilitation, Upgradation & Widening of existing Highway to 2 Lane / 4 Lane with Paved Shoulder from Km. 55/800 to Km. 113/650 (Length = 57.850 Km.) on NH 353C from Soni Village to Gadchiroli is a lapsed road project in Adapalli, Gadchiroli, Maharashtra. The site covers 279.5 acres. Its stated project cost is ₹730 crore. As of 27 Nov 2026, its status is “Lapsed” (since 8 May 2026).

See it on the live map All projects in Gadchiroli

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 2.98 Ha. of Forest Land for Rehabilitation, Upgradation & Widening of existing Highway to 2 Lane / 4 Lane with Paved Shoulder from Km. 55/800 to Km. 113/650 (Length = 57.850 Km.) on NH 353C from Soni Village to Gadchiroli is a lapsed road project in Adapalli, Gadchiroli, Maharashtra. The site covers 279.5 acres.

Who is building it?

The applicant is National Highway Division Gadchiroli.

Has it been approved?

No. The application was lapsed on 8 May 2026, so it is no longer under consideration.

Where is it?

In Adapalli, Gadchiroli, Maharashtra.

How big is it?

It has a stated cost of ₹730 crore; a site of 279.5 acres and 7.4 acres (3 ha) of forest land.

When was it filed?

The application was filed on 31 Mar 2026.

Project details

Official titleDiversion of 2.98 Ha. of Forest Land for Rehabilitation, Upgradation & Widening of existing Highway to 2 Lane / 4 Lane with Paved Shoulder from Km. 55/800 to Km. 113/650 (Length = 57.850 Km.) on NH 353C from Soni Village to Gadchiroli in Gadchiroli district in the State of Maharashtra
StatusLapsed
Status since8 May 2026
Application filed31 Mar 2026
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantNational Highway Division Gadchiroli
Land area279.5 acres (113.1 ha)
Forest land7.4 acres (3 ha)
Project cost₹730 crore
Village / localityAdapalli
Taluk / tehsilGadchiroli
DistrictGadchiroli
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-15030

In context

69 applications in Gadchiroli since January 2022 are in the same category (Roads & highways): 3 approved, 47 filed or under review, and 19 withdrawn, lapsed or rejected. At 279.5 acres, this one is larger than 51% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Adapalli, Gadchiroli, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.