Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 1 Sept 2026 |
| Application filed | 8 Jun 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Mahatransco |
| Land area | 305.5 acres (123.7 ha) |
| Forest land | 2.3 acres (0.9 ha) |
| Project cost | ₹10.7 crore |
| Village / locality | Dighe |
| Taluk / tehsil | Thane |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15087 |
In context
11 applications in Thane since January 2022 are in the same category (Power): 1 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. At 305.5 acres, this one is larger than 60% of them.
182 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dighe, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for Laying Optical Fiber Cable of M/s Dataexpress… — initial checks, 0 m away
- Diversion of forest Land for Laying Optical Fiber Cable of M/s. Dinesh… — lapsed, 600 m away
- Approached Road — lapsed, 650 m away
- DIVERSION OF 0.8295 Ha. FOREST LAND FOR PROPOSED LILO ON ONE CKT 220 KV KALWA-… — lapsed, 700 m away
- Diversion of Restored Private Forest Land (Restored before 25/10/1980) For… — lapsed, 950 m away
- BOM 2 to 7 Data Centre building, Ancillary & Substation Structures on final… — environmental approval granted, 950 m away
- BOM 2 to 7 Data Centre building, Ancillary & Substation Structures on final… — cleared for impact study, 950 m away
- "BOM" – Proposed Data Center Project at Survey No: 238/2, Part of Village… — environmental approval granted, 950 m away
More from Mahatransco in Thane
- LILO on existing 100 KV D/C Ambernath Century Rayon and Ambernath Padghe… — in-principle approval, conditions pending
- DIVERSION OF 0.8295 Ha. FOREST LAND FOR PROPOSED LILO ON ONE CKT 220 KV KALWA-… — lapsed
- 33 KV Padghe Malegaon Eletrode Line Aginst Shifting of Exisiting 33 KV Padghe… — in-principle approval, conditions pending
- Application for Wildlife Clearance From Standing Committee of Sbwl & Nbwl… — more information requested
- 33 KV Padghe Malegaon Eletrode Line Aginst Shifting of Exisiting 33 KV Padghe… — more information requested
- 33 KV Padghe Malegaon Eletrode Line Aginst Shifting of Exisiting 33 KV Padghe… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.