Quick answers
What is Approached Road?
Approached Road is a lapsed road project in Ashte, Panvel, Raigarh, Maharashtra. The site covers 0 acres.
Who is building it?
The applicant is Destiny Reality India LLP.
Has it been approved?
No. The application was lapsed on 24 Oct 2026, so it is no longer under consideration.
Where is it?
In Ashte, Panvel, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹15 lakh; a site of 0 acres and 60 m² of forest land.
When was it filed?
The application was filed on 1 Dec 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 24 Oct 2026 |
| Application filed | 1 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Destiny Reality India LLP |
| Land area | 100 m² |
| Forest land | 60 m² |
| Project cost | ₹15 lakh |
| Village / locality | Ashte |
| Taluk / tehsil | Panvel |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15175 |
In context
70 applications in Raigarh since January 2022 are in the same category (Roads & highways): 10 approved, 33 filed or under review, and 27 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
56 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ashte, Panvel, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Approach Road — initial checks, 50 m away
- Proposed Residential Development on Land Bearing Survey No.:136, 138/1,… — environmental approval granted, 700 m away
- Approach Road to Private Land — more information requested, 1.3 km away
- Diversion of Forest Area for the Construction of Flyover Bridge on NH 48 From… — in-principle approval, conditions pending, 1.4 km away
- Container Freight Station, Warehouse with Railway Siding at… — lapsed, 1.4 km away
- Container Freight Station, Warehouse with Railway Siding at… — lapsed, 1.4 km away
- Emperia Builtcon — environmental approval granted, 1.5 km away
- Proposed 6-Lane Access Controlled Section of NH-348B (Greenfield) from Pagote… — cleared for impact study, 1.8 km away