LapsedRoads & highways · Ahmadnagar, Maharashtra

Diversion of 0.5100 Ha. Forest Land for Balance work of Up-gradation to 4 Lane with Paved Shoulder configuration of the highway starting from existing km 88.400 (Savali Vihir) to Km 163.400 (Start of Ahmednagar Bypass) (Design Length - 75.000 km) section of NH-160 by NHAI

Diversion of 0.5100 Ha. Forest Land for Balance work of Up-gradation to 4 Lane with Paved Shoulder configuration of the highway starting from existing km 88.400 (Savali Vihir) to Km 163.400 (Start of Ahmednagar Bypass) (Design Length - 75.000 km) section of NH-160 by NHAI is a lapsed road project in Rahuri Kh., Rahuri, Ahmadnagar, Maharashtra. It seeks 1.3 acres of forest land. Its stated project cost is ₹515 crore. As of 27 Nov 2026, its status is “Lapsed” (since 14 Jul 2025).

See it on the live map All projects in Ahmadnagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of 0.5100 Ha. Forest Land for Balance work of Up-gradation to 4 Lane with Paved Shoulder configuration of the highway starting from existing km 88.400 (Savali Vihir) to Km 163.400 (Start of Ahmednagar Bypass) (Design Length - 75.000 km) section of NH-160 by NHAI is a lapsed road project in Rahuri Kh., Rahuri, Ahmadnagar, Maharashtra. It seeks 1.3 acres of forest land.

Who is building it?

The applicant is National Highways Authority of India (NHAI).

Has it been approved?

No. The application was lapsed on 14 Jul 2025, so it is no longer under consideration.

Where is it?

In Rahuri Kh., Rahuri, Ahmadnagar, Maharashtra.

How big is it?

It has a stated cost of ₹515 crore and 1.3 acres (0.5 ha) of forest land.

When was it filed?

The application was filed on 9 Jun 2025.

Project details

Official titleDiversion of 0.5100 Ha. Forest Land for Balance work of Up-gradation to 4 Lane with Paved Shoulder configuration of the highway starting from existing km 88.400 (Savali Vihir) to Km 163.400 (Start of Ahmednagar Bypass) (Design Length - 75.000 km) section of NH-160 in Ahilyanagar District in the State of Maharashtra under Bharatmala Pariyojana on EPC Mode.
StatusLapsed
Status since14 Jul 2025
Application filed9 Jun 2025
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantNational Highways Authority of India (NHAI)
Forest land1.3 acres (0.5 ha)
Project cost₹515 crore
Village / localityRahuri Kh.
Taluk / tehsilRahuri
DistrictAhmadnagar
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-15183

In context

15 applications in Ahmadnagar since January 2022 are in the same category (Roads & highways): 0 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected.

Where it is

Rahuri Kh., Rahuri, Ahmadnagar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 548 National Highways Authority of India (NHAI) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.