What is Developing? Open the mapMap

In-principle approval, conditions pendingRailways & metro · Yavatmal, Maharashtra

Diversion of Forest Land 0.75 Ha for Construction of Over Bridge on Railway Line passing through Forest area

Diversion of Forest Land 0.75 Ha for Construction of Over Bridge on Railway Line passing through Forest area is a proposed railway project in Bhosa, Yavatmal, Maharashtra. The site covers 1.9 acres. Its stated project cost is ₹7.9 crore. As of 27 Nov 2026, its status is “In-principle approval, conditions pending” (since 15 Jul 2025).

See it on the live map All projects in Yavatmal

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of Forest Land 0.75 Ha for Construction of Over Bridge on Railway Line passing through Forest area is a proposed railway project in Bhosa, Yavatmal, Maharashtra. The site covers 1.9 acres.

Who is building it?

The applicant is Dy Chief Engineer (Construction) Wardha.

Has it been approved?

Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.

Where is it?

In Bhosa, Yavatmal, Maharashtra.

How big is it?

It has a stated cost of ₹7.9 crore; a site of 1.9 acres and 1.9 acres (0.8 ha) of forest land.

When was it filed?

The application was filed on 9 Sept 2024.

Project details

Official titleDiversion of Forest Land 0.75 Ha for Construction of Over Bridge on Railway Line passing through Forest area at village Bhosa and Bodgavhan.
StatusIn-principle approval, conditions pending
Status since15 Jul 2025
Application filed9 Sept 2024
Approval soughtForest land use
Application typeNew project
SectorRailways & metro
ApplicantDy Chief Engineer (Construction) Wardha
Land area1.9 acres (0.8 ha)
Forest land1.9 acres (0.8 ha)
Project cost₹7.9 crore
Village / localityBhosa
Taluk / tehsilYavatmal
DistrictYavatmal
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-15307

In context

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bhosa, Yavatmal, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 6 Dy Chief Engineer projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.