Quick answers
What is this project?
Re-diversion forest land for laying of Optical fiber cable of Vodafone Idea Telecom Infrastructure Ltd Project along the ROW of Gandhinjlaj-AJRA-Halkarni (RHS Side) is an approved telecom project in Alyachiwadi (N.V.), Ajra, Kolhapur, Maharashtra. The site covers 1,491.6 acres.
Who is building it?
The applicant is Vodafone Idea Telecom Infrastructure Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 23 Jan 2026), as of 27 Nov 2026.
Where is it?
In Alyachiwadi (N.V.), Ajra, Kolhapur, Maharashtra.
How big is it?
It has a stated cost of ₹6 lakh; a site of 1,491.6 acres and 2,560 m² of forest land.
When was it filed?
The application was filed on 23 Apr 2025.
Project details
| Official title | Proposal for re-diversion forest land for laying of Optical fiber cable of Vodafone Idea Telecom Infrastructure Ltd Project along the ROW of Gandhinjlaj-AJRA-Halkarni (RHS Side) in Kolhapur District under Kolhapur Forest Division. In the state of Maharashtra. |
|---|---|
| Status | Forest land use approved |
| Status since | 23 Jan 2026 |
| Application filed | 23 Apr 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Vodafone Idea Telecom Infrastructure Limited |
| Land area | 1,491.6 acres (603.6 ha) |
| Forest land | 2,560 m² |
| Project cost | ₹6 lakh |
| Village / locality | Alyachiwadi (N.V.) |
| Taluk / tehsil | Ajra |
| District | Kolhapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15534 |
In context
18 applications in Kolhapur since January 2022 are in the same category (Telecom): 3 approved, 2 filed or under review, and 13 withdrawn, lapsed or rejected. At 1,491.6 acres, this one is larger than 82% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Alyachiwadi (N.V.), Ajra, Kolhapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rehabilitation And Up-gradation of Amboli Junction(Design Ch-71+530 To Ajara… — more information requested, 150 m away
- MahaNet-I(BHaratNet-II)-Kolhapur- Ajra-Application-1 — lapsed, 3 km away
- Re Appraisal of Environmental Clearance Granted by Deiaa for the Basalt Stone… — lapsed, 5.3 km away
- Reappraisal of Environment Clearance granted by DEIAA to the Basalt stone mine… — lapsed, 5.5 km away
- Diversion of Forest Land for Laying of Underground Ofc Duct & Cable Within Row… — lapsed, 7.3 km away
- Kolhapur Off-Stream Closed Loop Pumped Storage Project (1200 MW) — cleared for impact study, 9.5 km away
- Environmental Clearance for the Stone Quarry of Shri. Sunil Arjun Shintre — environmental approval granted, 12.1 km away
- Proposed 100 KLPD Grain based Distillery by M/s. Dinkarrao Jadhav Industries LLP — environmental approval granted, 14.2 km away
More from Vodafone Idea Telecom Infrastructure Limited in Kolhapur
- Re-diversion forest land for laying of Optical fiber cable of Vodafone Idea… — forest land use approved
All 71 Vodafone Idea Telecom projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.