Quick answers
What is this project?
Diversion of 77.127 Ha of Forest Land for Establishment of 54.4 MW Wind Power Project in Favour of M/S. Enercon India Limited is a proposed power project in Shivajinagar (N.V.), Akola, Ahmadnagar, Maharashtra. The site covers 3.6 acres.
Who is building it?
The applicant is Viviid Clean Energy Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Shivajinagar (N.V.), Akola, Ahmadnagar, Maharashtra.
How big is it?
It has a stated cost of ₹2 crore; a site of 3.6 acres and 3.5 acres (1.4 ha) of forest land.
When was it filed?
The application was filed on 17 Jan 2025.
Project details
| Official title | Diversion of 77.127 Ha of Forest Land for Establishment of 54.4 MW Wind Power Project in Favour of M/S. Enercon India Limited in Ahmednagar District of Maharashtra-Transfer of Lease |
|---|---|
| Status | Under forest review |
| Status since | 29 May 2025 |
| Application filed | 17 Jan 2025 |
| Approval sought | Forest land use |
| Application type | Ownership transfer |
| Sector | Power |
| Applicant | Viviid Clean Energy Private Limited |
| Land area | 3.6 acres (1.4 ha) |
| Forest land | 3.5 acres (1.4 ha) |
| Project cost | ₹2 crore |
| Village / locality | Shivajinagar (N.V.) |
| Taluk / tehsil | Akola |
| District | Ahmadnagar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15635 |
In context
6 applications in Ahmadnagar since January 2022 are in the same category (Power): 1 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Shivajinagar (N.V.), Akola, Ahmadnagar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Wind Project — lapsed, 4.8 km away
- Diversion Of Forest Land Laying Underground OFC along the Existing Right Of… — lapsed, 6.8 km away
- Diversion Of Forest Land Laying Underground OFC along the Existing Right Of… — in-principle approval, conditions pending, 12.7 km away
- Shri. Govind Bhimaji Sadgir — environmental approval granted, 13.5 km away
- Shree Swami Samarth Stone Crusher by Shri. Kisan Laxman Sadgir — lapsed, 14 km away
- Mr. Kisan Laxman Sadgir — environmental approval granted, 14.5 km away
- Expansion of Hotel Paradise Resort — more information requested, 18.2 km away
- Diversion of 0.40 ha reserved forest land for Construction of Malegaon… — under forest review, 18.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.