Quick answers
What is this project?
Diversion of 35.42 HA. of Reserved Forest Land for installation of Wind Power Turbines (3300 KW each capacity X 25) generating 82.5 MW for Wind Power Project, Approach Road, Transmission Line at Villages Savarde (Tarf Asandoli), Waghurde, Sule, Kodavade, Gogave, Wetavade,Panore. Taluka- Panhala &Villages Khatangale, Pasarde, Upavade, Bololi, Shipekarwadi, Amashi,Taluka:Karveer,&Villages Pal(Khurd),Pal(Bk.) Gotewadi,Mahsurli.Taluka-Radhanagar is a lapsed building project in Wetavade, Panhala, Kolhapur, Maharashtra. The site covers 89 acres.
Who is building it?
The applicant is Cmes Jupiter Private Limited.
Has it been approved?
No. The application was lapsed on 31 Jul 2025, so it is no longer under consideration.
Where is it?
In Wetavade, Panhala, Kolhapur, Maharashtra.
How big is it?
It has a stated cost of ₹750 crore; a site of 89 acres and 87.5 acres (35.4 ha) of forest land.
When was it filed?
The application was filed on 30 May 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 31 Jul 2025 |
| Application filed | 30 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Cmes Jupiter Private Limited |
| Land area | 89 acres (36 ha) |
| Forest land | 87.5 acres (35.4 ha) |
| Project cost | ₹750 crore |
| Village / locality | Wetavade |
| Taluk / tehsil | Panhala |
| District | Kolhapur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15676 |
In context
33 applications in Kolhapur since January 2022 are in the same category (Buildings & townships): 23 approved, 7 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 89 acres, this one is larger than 82% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Wetavade, Panhala, Kolhapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re Appraisal of Environmental Clearance Granted by Deiaa for the Basalt Stone… — environmental approval granted, 4.8 km away
- Diversion of Forest Land for Underground Ofc Duct and Cable Within Row of… — more information requested, 7.1 km away
- Expansion of Sugar unit from 5,000 to 10,000 TCD, Cogeneration Unit from 19.5… — lapsed, 11.2 km away
- Expansion of Sugar unit from 5,000 to 10,000 TCD, Cogeneration Unit from 19.5… — cleared for impact study, 11.2 km away
- Expansion of Sugar Unit From 5,000 to 10,000 Tcd, Cogeneration Unit From 19.5… — cleared for impact study, 11.2 km away
- Environmental Clearance for the stone quarry of Sou. Savita Sanjay Patil &… — environmental approval granted, 11.5 km away
- Water Supply Pipeline for Agriculture Use to Shri.Dinkar Dadaso Patil — more information requested, 11.6 km away
- Two Lane Paved Shoulder in the state of Maharashtra from T-Junction at (NH… — under forest review, 14.4 km away
All 4 Cmes Jupiter projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.