Project details
| Status | Lapsed |
|---|---|
| Status since | 27 Jun 2024 |
| Application filed | 4 Mar 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Shahnawaz Ahmad |
| Forest land | 890 m² |
| Project cost | ₹8 lakh |
| Village / locality | Malakapur |
| Taluk / tehsil | Patur |
| District | Akola |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15726 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 4 Mar 2024 (this page) | Lapsed | ₹8 lakh | |
| Change of use filed 5 Sept 2023 | Lapsed | ₹8 lakh |
In context
18 applications in Akola since January 2022 are in the same category (Telecom): 0 approved, 8 filed or under review, and 10 withdrawn, lapsed or rejected.
Where it is
Malakapur, Patur, Akola, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bharti Airtel Ltd. 5G OFC Project Akola-Charangaon route DFO Akola — lapsed, 0 m away
- Diversion of Forest Land for Laying Optical Fiber Cable Within Row of the… — more information requested, 12.2 km away
- Diversion of forest Land Laying Underground OFC of Bharti Airtel Ltd. along… — more information requested, 12.4 km away
- Diversion of forest Land Laying Underground OFC of Bharti Airtel Ltd. along… — lapsed, 12.4 km away
- Diversion of 0.044 Ha. Forest Land for Underground Ofc Duct and Cable Within… — lapsed, 12.4 km away
- Diversion of 0.044 Ha. Forest Land for Underground Ofc Duct and Cable Within… — lapsed, 12.4 km away
- Diversion of 7.7244 Ha Forest Land for Upgradation, Reconstruction, Widening… — more information requested, 12.9 km away
- Diversion of 7.7244 Ha Forest Land for Upgradation, Reconstruction, Widening… — lapsed, 12.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.