What is this project?
220kV DC Transmission Line from Proposed 600 MW Solar Power Project, Shirdane Substation to Existing 400/220/132kV Dhule (Kundane) Substation, MSETCL Dhule Transmission line is a lapsed power project in Kundane (Warkhede), Dhule, Maharashtra. The site covers 159.8 acres.
Who is building it?
The applicant is Avaada Energy Private Limited.
Has it been approved?
No. The application was lapsed on 31 May 2026, so it is no longer under consideration.
Where is it?
In Kundane (Warkhede), Dhule, Maharashtra.
How big is it?
It has a stated cost of ₹100 crore; a site of 159.8 acres and 10.9 acres (4.4 ha) of forest land.
When was it filed?
The application was filed on 5 Apr 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 31 May 2026 |
| Application filed | 5 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Avaada Energy Private Limited |
| Land area | 159.8 acres (64.7 ha) |
| Forest land | 10.9 acres (4.4 ha) |
| Project cost | ₹100 crore |
| Village / locality | Kundane (Warkhede) |
| Taluk / tehsil | Dhule |
| District | Dhule |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15760 |
In context
14 applications in Dhule since January 2022 are in the same category (Power): 2 approved, 7 filed or under review, and 5 withdrawn, lapsed or rejected. At 159.8 acres, this one is smaller than 57% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kundane (Warkhede), Dhule, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 3.5315 Ha. Forest Land for Proposed 220 KV DC Transmission line… — more information requested, 4.4 km away
- Environment Clearance for Basalt Stone Mining Project (Area 1.80 ha) at Gut… — environmental approval granted, 4.8 km away
- Environment Clearance for Proposed Construction of Staff Quarters TYPE-II,… — environmental approval granted, 7.8 km away
- Aws — lapsed, 9.2 km away
- Environment clearance for Proposed Construction of New Court Building at CTS… — environmental approval granted, 9.5 km away
- Environmental Clearance for Basalt Stone Mining Project (Area 1.00 ha) at Gut… — environmental approval granted, 10.8 km away
- "Construction of New 12 Wards (360 Bedded) Hospital Building" by M/s Shri.… — environmental approval granted, 12.2 km away
- Sulwade Jamphal Kanoli Lift Irrigation Scheme — lapsed, 12.7 km away