Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 24 Sept 2025 |
| Application filed | 2 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | The Tata Power Co LTD |
| Land area | 92.5 acres (37.4 ha) |
| Forest land | 11.3 acres (4.6 ha) |
| Project cost | ₹198.3 crore |
| Village / locality | Arewali |
| Taluk / tehsil | Thane |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15769 |
In context
11 applications in Thane since January 2022 are in the same category (Power): 1 approved, 9 filed or under review, and 1 withdrawn, lapsed or rejected. At 92.5 acres, this one is smaller than 60% of them.
138 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Arewali, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application for EC for the development of Residential cum Commercial project… — environmental approval granted, 800 m away
- Integrated Township Project at village Usarghar and Sandap, Dist- Thane.… — environmental approval granted, 1 km away
- Integrated Township Project at village Usarghar and Sandap, Dist- Thane.… — cleared for impact study, 1 km away
- Integrated Township Project at village Usarghar and Sandap, Dist- Thane.… — withdrawn, 1 km away
- Integrated Township Project at village Usarghar and Sandap, Dist- Thane.… — environmental approval granted, 1 km away
- Integrated Township Project at village Usarghar and Sandap, Dist- Thane.… — cleared for impact study, 1 km away
- Diversion of Forest area for proposed construction of Link road from NH-4… — more information requested, 1.6 km away
- "Integrated Township Project" at Village Gharivali and Usarghar, Tal- Kalyan,… — withdrawn, 2 km away
All 25 The Tata Power Co projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.