Quick answers
What is this project?
Diversion of 0.2356 ha Forest Land for Connectivity of MTHL to Mumbai Pune Expressway (Palaspe Phata to Mumbai Pune Expressway Junction, Length- 2.84 km) is a lapsed road project in Ariwali, Panvel, Raigarh, Maharashtra. The site covers 49.3 acres.
Who is building it?
The applicant is Mumbai Metropolitan Region Development Authority.
Has it been approved?
No. The application was lapsed on 28 May 2024, so it is no longer under consideration.
Where is it?
In Ariwali, Panvel, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹1,351.7 crore; a site of 49.3 acres and 2,360 m² of forest land.
When was it filed?
The application was filed on 21 Sept 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 28 May 2024 |
| Application filed | 21 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Mumbai Metropolitan Region Development Authority |
| Land area | 49.3 acres (20 ha) |
| Forest land | 2,360 m² |
| Project cost | ₹1,351.7 crore |
| Village / locality | Ariwali |
| Taluk / tehsil | Panvel |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-15794 |
In context
70 applications in Raigarh since January 2022 are in the same category (Roads & highways): 10 approved, 33 filed or under review, and 27 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval. At 49.3 acres, this one is larger than 73% of them.
75 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ariwali, Panvel, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 6-Lane Access Controlled Section of NH-348B (Greenfield) from Pagote… — cleared for impact study, 150 m away
- Diversion of Forest Area for the Construction of Flyover Bridge on NH 48 From… — in-principle approval, conditions pending, 600 m away
- Arihant Aspire By Arihant Adobe Ltd — environmental approval granted, 1.7 km away
- Arihant Aspire By Arihant Adobe Ltd — cleared for impact study, 1.7 km away
- Container Freight Station, Warehouse with Railway Siding at… — lapsed, 1.8 km away
- Container Freight Station, Warehouse with Railway Siding at… — lapsed, 1.8 km away
- Proposed Residential Development on Land Bearing Survey No.:136, 138/1,… — environmental approval granted, 1.8 km away
- Building project by M/s. KONNARK SKYCITY. — under environmental review, 1.9 km away
More from Mumbai Metropolitan Region Development Authority in Raigarh
- Six Ramps and Allied Works at Shivajinagar Interchange of MTHL by MMRDA — coastal clearance granted
5 Mumbai Metropolitan Region Development Authority (Mmrda) projects in Raigarh
All 36 Mumbai Metropolitan Region Development Authority (Mmrda) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.