What is Developing? Open the mapMap

Under forest reviewBuildings & townships · Chandrapur, Maharashtra

Re-Diversion Proposal Over 9.181 Ha of Forest Land Required for Laying Underground Iron Ore Slurry Pipeline

Re-Diversion Proposal Over 9.181 Ha of Forest Land Required for Laying Underground Iron Ore Slurry Pipeline is a proposed building project in Itoli Chak No.1, Ballarpur, Chandrapur, Maharashtra. The site covers 51.9 acres. Its stated project cost is ₹400 crore. As of 27 Nov 2026, its status is “Under forest review” (since 26 Oct 2026).

See it on the live map All projects in Chandrapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Re-Diversion Proposal Over 9.181 Ha of Forest Land Required for Laying Underground Iron Ore Slurry Pipeline is a proposed building project in Itoli Chak No.1, Ballarpur, Chandrapur, Maharashtra. The site covers 51.9 acres.

Who is building it?

The applicant is Lloyds Metals and Energy Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.

Where is it?

In Itoli Chak No.1, Ballarpur, Chandrapur, Maharashtra.

How big is it?

It has a stated cost of ₹400 crore; a site of 51.9 acres and 22.7 acres (9.2 ha) of forest land.

When was it filed?

The application was filed on 20 May 2026.

Project details

Official titleRe-Diversion Proposal Over 9.181 Ha of Forest Land Required for Laying Underground Iron Ore Slurry Pipeline Along With 2 Numbers of Optical Fiber Cable of 2" Dia Within the Row of Existing NH, Zp and Pwd Roads From Village Hedri to Usgaon Within Jurisdiction of Bhamragarh & Alapalli Forest Division of Gadchiroli District and Within Jurisdiction of Central Chanda Forest Division of Chandrapur District in Favour of M/S Lloyds Metals and Energy Limited in the State of Maharashtra.
StatusUnder forest review
Status since26 Oct 2026
Application filed20 May 2026
Approval soughtForest land use
Application typeChange of use
SectorBuildings & townships
ApplicantLloyds Metals and Energy Limited
Land area51.9 acres (21 ha)
Forest land22.7 acres (9.2 ha)
Project cost₹400 crore
Village / localityItoli Chak No.1
Taluk / tehsilBallarpur
DistrictChandrapur
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-15861

In context

26 applications in Chandrapur since January 2022 are in the same category (Buildings & townships): 1 approved, 17 filed or under review, and 8 withdrawn, lapsed or rejected. At 51.9 acres, this one is larger than 69% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Itoli Chak No.1, Ballarpur, Chandrapur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Lloyds Metals and Energy Limited in Chandrapur

10 Lloyds Metals and Energy projects in Chandrapur
All 40 Lloyds Metals and Energy projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.