Quick answers
What is this project?
Re-diversion forest land for laying of Optical fiber cable of M/s. Dinesh Engineers Limited, Mumbai Project along the ROW of Ambazari Sub Station To Anjangaon is a lapsed telecom project in Pardi Rithi, Savner, Nagpur, Maharashtra. It seeks 0.3 acres of forest land.
Who is building it?
The applicant is Dinesh Engineers Limited Depl.
Has it been approved?
No. The application was lapsed on 22 Nov 2026, so it is no longer under consideration.
Where is it?
In Pardi Rithi, Savner, Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹63 lakh and 1,150 m² of forest land.
When was it filed?
The application was filed on 10 Mar 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Re-diversion forest land for laying of Optical fiber cable of M/s. Dinesh Engineers…
Project details
| Official title | Proposal for re-diversion forest land for laying of Optical fiber cable of M/s. Dinesh Engineers Limited, Mumbai Project along the ROW of Ambazari Sub Station To Anjangaon in Nagpur District under Nagpur Forest Division. In the state of Maharashtra. |
|---|---|
| Status | Lapsed |
| Status since | 22 Nov 2026 |
| Application filed | 10 Mar 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Dinesh Engineers Limited Depl |
| Forest land | 1,150 m² |
| Project cost | ₹63 lakh |
| Village / locality | Pardi Rithi |
| Taluk / tehsil | Savner |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16060 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 10 Mar 2026 (this page) | Lapsed | ₹63 lakh | |
| New project filed 3 Apr 2025 | More information requested | ₹63 lakh |
In context
15 applications in Nagpur since January 2022 are in the same category (Telecom): 0 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected.
Where it is
Pardi Rithi, Savner, Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-diversion forest land for laying of Optical fiber cable of M/s. Dinesh… — more information requested, 0 m away
- Stone Quarry proposal of Mr. Anand Ashok Budhraja & Mr. Awadhesh Ramkrushna… — environmental approval granted, 5.6 km away
- Environmental Clearance for Basalt Stone Mining Project (Area 2.83 ha) at Gut… — environmental approval granted, 6.3 km away
- Chhatrapur Stone Quarry, Kh. No 139/2, Area 2.80 Ha. Village Chhatrapur, Ta.… — environmental approval granted, 6.5 km away
- Borgaon (JA) (Stone & Murrum) Quarry Project located at Gut No. 108 & 109,… — environmental approval granted, 6.7 km away
- Reappraisal of Environmental Clearance Granted by DEIAA vide letter No DEIAA… — environmental approval granted, 6.8 km away
- Change of name of Borgaon(J) Stone quarry proposal of Mr. Swapan Kumar Ganguli… — lapsed, 6.8 km away
- Environment Clearance for Basalt Stone Mining Project (Area 1.82 ha) at Gut… — under environmental review, 7 km away
More from Dinesh Engineers Limited Depl in Nagpur
- The diversion of forest Land of Laying Underground OFC along the existing… — more information requested
3 Dinesh Engineers Limited projects in Nagpur
All 14 Dinesh Engineers Limited projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.