Quick answers
What is this project?
Re-Diversion of Forest Area for Construction of New Service Roads With Concrete Pavement and a Six-Lane Elevated Corridor in the Central Median Within Existing Section of Nh-4b & NH-348 is a lapsed road project in Jasai, Uran, Raigarh, Maharashtra. The site covers 652.2 acres.
Who is building it?
The applicant is Mumbai Metropolitan Region Development Authority (Mmrda).
Has it been approved?
No. The application was lapsed on 11 Oct 2026, so it is no longer under consideration.
Where is it?
In Jasai, Uran, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹300 crore; a site of 652.2 acres and 27.5 acres (11.1 ha) of forest land.
When was it filed?
The application was filed on 24 Mar 2026.
Project details
| Official title | Re-Diversion of Forest Area for Construction of New Service Roads With Concrete Pavement and a Six-Lane Elevated Corridor in the Central Median Within Existing Section of Nh-4b & NH-348 in Raigad District in the State of Maharashtra. |
|---|---|
| Status | Lapsed |
| Status since | 11 Oct 2026 |
| Application filed | 24 Mar 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Mumbai Metropolitan Region Development Authority (Mmrda) |
| Land area | 652.2 acres (263.9 ha) |
| Forest land | 27.5 acres (11.1 ha) |
| Project cost | ₹300 crore |
| Village / locality | Jasai |
| Taluk / tehsil | Uran |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16083 |
In context
70 applications in Raigarh since January 2022 are in the same category (Roads & highways): 10 approved, 33 filed or under review, and 27 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval. At 652.2 acres, this one is larger than 93% of them.
69 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jasai, Uran, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed New Construction for Logistics Park and Regularization of Existing… — under forest review, 1.2 km away
- Construction for New Logistics Park and Reguarization of Existing Construction… — lapsed, 1.2 km away
- Construction for New Logistics Park and Regularization of Existing… — more information requested, 1.2 km away
- Proposed Residential cum commercial building on plot no 02, sector 26 A,… — environmental approval granted, 1.6 km away
- Environment Clearance for Proposed Expansion of Residential Cum Commercial… — environmental approval granted, 1.6 km away
- Environment Clearance for Proposed Residential Cum Commercial Project at Plot… — environmental approval granted, 1.8 km away
- Environment Clearance for Proposed Residential Cum Commercial Project at Plot… — environmental approval granted, 1.8 km away
- Environment Clearance for Proposed Residential Cum Commercial Project at Plot… — cleared for impact study, 1.8 km away
More from Mumbai Metropolitan Region Development Authority (Mmrda) in Raigarh
- Six ramps and allied works of Shivajinagar interchange of Mumbai Trans Harbour… — in-principle approval, conditions pending
- Diversion of Forest Area for the Construction of Flyover Bridge on NH 48 From… — in-principle approval, conditions pending
5 Mumbai Metropolitan Region Development Authority (Mmrda) projects in Raigarh
All 36 Mumbai Metropolitan Region Development Authority (Mmrda) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.