LapsedBuildings & townships · Satara, Maharashtra

Diversion of Forest Land for Expansion of Swaraj Green Power and Fuel Limited Sugar Factory

Diversion of Forest Land for Expansion of Swaraj Green Power and Fuel Limited Sugar Factory is a lapsed building project in Upalave, Phaltan, Satara, Maharashtra. The site covers 19.8 acres. Its stated project cost is ₹950 crore. As of 27 Nov 2026, its status is “Lapsed” (since 2 Sept 2024).

See it on the live map All projects in Satara

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of Forest Land for Expansion of Swaraj Green Power and Fuel Limited Sugar Factory is a lapsed building project in Upalave, Phaltan, Satara, Maharashtra. The site covers 19.8 acres.

Who is building it?

The applicant is Swaraj Green Power and Fuel Limited.

Has it been approved?

No. The application was lapsed on 2 Sept 2024, so it is no longer under consideration.

Where is it?

In Upalave, Phaltan, Satara, Maharashtra.

How big is it?

It has a stated cost of ₹950 crore; a site of 19.8 acres and 19.8 acres (8 ha) of forest land.

When was it filed?

The application was filed on 15 May 2024.

Project details

Official titleProposal for Diversion of Forest Land for Expansion of Swaraj Green Power and Fuel Limited Sugar Factory in Uplave Village Tal- Phaltan Dist - Satara
StatusLapsed
Status since2 Sept 2024
Application filed15 May 2024
Approval soughtForest land use
Application typeNew project
SectorBuildings & townships
ApplicantSwaraj Green Power and Fuel Limited
Land area19.8 acres (8 ha)
Forest land19.8 acres (8 ha)
Project cost₹950 crore
Village / localityUpalave
Taluk / tehsilPhaltan
DistrictSatara
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-16149

In context

52 applications in Satara since January 2022 are in the same category (Buildings & townships): 20 approved, 23 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 19.8 acres, this one is smaller than 52% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Upalave, Phaltan, Satara, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Swaraj Green Power and Fuel Limited in Satara

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.