Quick answers
What is this project?
Diversion of the Protected Forest Land for Construction of Approach Road for Development of Integrated Industrial Area (Iia) is a lapsed road project in Chal, Panvel, Raigarh, Maharashtra. It seeks 2 acres of forest land.
Who is building it?
The applicant is Calculus Logistech Private Limited.
Has it been approved?
No. The application was lapsed on 15 Aug 2025, so it is no longer under consideration.
Where is it?
In Chal, Panvel, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹2.3 crore and 2 acres (0.8 ha) of forest land.
When was it filed?
The application was filed on 30 Jun 2025.
Project details
| Official title | Diversion of the Protected Forest Land for Construction of Approach Road for Development of Integrated Industrial Area (Iia) at Village Nitalas Tal. Panvel Dist. Raigad |
|---|---|
| Status | Lapsed |
| Status since | 15 Aug 2025 |
| Application filed | 30 Jun 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Calculus Logistech Private Limited |
| Forest land | 2 acres (0.8 ha) |
| Project cost | ₹2.3 crore |
| Village / locality | Chal |
| Taluk / tehsil | Panvel |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16176 |
In context
70 applications in Raigarh since January 2022 are in the same category (Roads & highways): 10 approved, 33 filed or under review, and 27 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval.
89 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chal, Panvel, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.6684 Hectares of Protected Forest Land for the Construction of… — lapsed, 50 m away
- Approach Road, Water supply line & Electricity supply line through protected… — in-principle approval, conditions pending, 50 m away
- Re-diversion of 0.6684 Hectares of Protected Forest Land for the construction… — initial checks, 50 m away
- Approach Road — more information requested, 150 m away
- Synthetic Organic Chemical (Plasticizer) Manufacturing Facility — lapsed, 1.4 km away
- Synthetic Organic Chemical (Plasticizer) Manufacturing Facility — environmental approval granted, 1.4 km away
- Synthetic Organic Chemical (Plasticizer) Manufacturing Facility — withdrawn, 1.4 km away
- Synthetic Organic Chemical (Plasticizer) Manufacturing Facility — environmental approval granted, 1.4 km away
More from Calculus Logistech Private Limited in Raigarh
- Approach Road, Water supply line & Electricity supply line through protected… — in-principle approval, conditions pending
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.