Quick answers
What is this project?
Diversion of Forest Land for Laying Underground Optical Fiber Cable Within Row of Existing Road of Hiwra Bazar to Ngp/Bhandara District Border in Nagpur Dist in the State of Maharashtra is a proposed road project in Fulzari, Ramtek, Nagpur, Maharashtra.
Who is building it?
The applicant is Reliance Jio Infocomm Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Fulzari, Ramtek, Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹14 lakh.
When was it filed?
The application was filed on 16 Nov 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of Forest Land for Laying Underground Optical Fiber Cable Within Row of…
Project details
| Official title | Proposal for Diversion of Forest Land for Laying Underground Optical Fiber Cable Within Row of Existing Road of Hiwra Bazar to Ngp/Bhandara District Border in Nagpur Dist in the State of Maharashtra. |
|---|---|
| Status | More information requested |
| Status since | 16 Nov 2023 |
| Application filed | 16 Nov 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Reliance Jio Infocomm Limited |
| Project cost | ₹14 lakh |
| Village / locality | Fulzari |
| Taluk / tehsil | Ramtek |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16350 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 4 Dec 2023 | More information requested | 1.3 acres | ₹14 lakh |
| New project filed 16 Nov 2023 (this page) | More information requested | ₹14 lakh |
In context
31 applications in Nagpur since January 2022 are in the same category (Roads & highways): 1 approved, 23 filed or under review, and 7 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Fulzari, Ramtek, Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for Laying Underground Optical Fiber Cable Within Row… — lapsed, 50 m away
- Diversion of Forest Land for Laying Underground Optical Fiber Cable Within Row… — more information requested, 1.3 km away
- Diversion of Forest Land for Laying Underground Optical Fiber Cable Within Row… — more information requested, 2.1 km away
- Mandri panchala Manganese Block — lapsed, 12.8 km away
- Mandari Panchala Manganese Block — more information requested, 12.8 km away
- Water Supply Project — more information requested, 13.9 km away
- Diversion of Forest Land for installation of 4G Mobile Tower under 4G… — under wildlife review, 14.8 km away
- Diversion of Forest Land for installation of 4G Mobile Tower under 4G… — more information requested, 14.8 km away
More from Reliance Jio Infocomm Limited in Nagpur
- Diversion of Forest Land for Laying Underground Optical Fiber Cable Within Row… — in-principle approval, conditions pending
- Diversion of Forest Land for Laying Underground Optical Fiber Cable Within Row… — more information requested
- Diversion of Forest Land for Laying Underground Optical Fiber Cable Within Row… — lapsed
- Diversion of Forest Land for Laying Underground Optical Fiber Cable Within Row… — more information requested
- Diversion of Forest Land for Laying Underground Optical Fiber Cable Within Row… — more information requested
- The diversion of forest Land of Laying Underground OFC along the existing… — more information requested
16 Reliance Jio Infocomm (Jio) projects in Nagpur
All 222 Reliance Jio Infocomm (Jio) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.