More information requestedIndustry · Palghar, Maharashtra

Proposed expansion project by increasing the production capacity from 18,000 MT/A to 40,000 MT/A of SS Round/ Square/ Rectangle/ Bars/ Flat/Patti, Billets, Hexagonal, Angle, RCS, Bloom, Slabs, Alloy Ingot/Nickel Alloy & replacing Induction Furnace Plant capacity from 2 no. of 3TP to 1 no. of 12TP by M/s Skytech Rolling Mill Pvt. Ltd.

Proposed expansion project by increasing the production capacity from 18,000 MT/A to 40,000 MT/A of SS Round/ Square/ Rectangle/ Bars/ Flat/Patti, Billets, Hexagonal, Angle, RCS, Bloom, Slabs, Alloy Ingot/Nickel Alloy & replacing Induction Furnace Plant capacity from 2 no. of 3TP to 1 no. of 12TP by M/s Skytech Rolling Mill Pvt. Ltd is a proposed industrial project in Usar, Vada, Palghar, Maharashtra. The site covers 11.3 acres. Its stated project cost is ₹26.7 crore. As of 27 Nov 2026, its status is “More information requested” (since 29 May 2023).

See it on the live map All projects in Palghar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed expansion project by increasing the production capacity from 18,000 MT/A to…

Project details

StatusMore information requested
Status since29 May 2023
Application filed29 May 2023
Approval soughtWildlife review
Application typeNew project
SectorIndustry
ApplicantSkytech Rolling Mill Private Limited
Land area11.3 acres (4.6 ha)
Project cost₹26.7 crore
Village / localityUsar
Taluk / tehsilVada
DistrictPalghar
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-16393

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 6 Jul 2024Lapsed11.3 acres₹26.7 crore
New project filed 29 May 2023 (this page)More information requested11.3 acres₹26.7 crore
Early planning filed 17 Apr 2023Cleared for impact study11.3 acres₹26.7 crore

In context

159 applications in Palghar since January 2022 are in the same category (Industry): 100 approved, 40 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 36 days from filing to approval. At 11.3 acres, this one is larger than 84% of them.

13 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Usar, Vada, Palghar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.