Quick answers
What is this project?
Required area 200 Sq. meter i.e. 0.02 ha. for installation of 4G Mobile Towers under 4G Saturation project in Survey no. 2 Private land Mouja Salai Pevat Tehsil Seloo district Wardha For 4G BSNL Tower lies in Buffer area of Bor Tiger Reserve, Wardha is a proposed telecom project in Salai(Pevath), Seloo, Wardha, Maharashtra. The site covers 0.1 acres.
Who is building it?
The applicant is Prashant Meshram.
Has it been approved?
Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.
Where is it?
In Salai(Pevath), Seloo, Wardha, Maharashtra.
How big is it?
It has a stated cost of ₹30 lakh and a site of 0.1 acres.
When was it filed?
The application was filed on 3 Dec 2024.
Project details
| Official title | Proposal for Required area 200 Sq. meter i.e. 0.02 ha. for installation of 4G Mobile Towers under 4G Saturation project in Survey no. 2 Private land Mouja Salai Pevat Tehsil Seloo district Wardha For 4G BSNL Tower lies in Buffer area of Bor Tiger Reserve, Wardha. |
|---|---|
| Status | Under wildlife review |
| Status since | 3 Dec 2024 |
| Application filed | 3 Dec 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Telecom |
| Applicant | Prashant Meshram |
| Land area | 300 m² |
| Project cost | ₹30 lakh |
| Village / locality | Salai(Pevath) |
| Taluk / tehsil | Seloo |
| District | Wardha |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16480 |
In context
5 applications in Wardha since January 2022 are in the same category (Telecom): 0 approved, 5 filed or under review, and 0 withdrawn, lapsed or rejected.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Salai(Pevath), Seloo, Wardha, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Works Fra 2006 and 2008 Under Section 3(2) for the Water Supply… — under wildlife review, 2.7 km away
- Proposed Expansion of Synthetic Organic Chemicals - Active Pharmaceutical… — lapsed, 3.5 km away
- Proposed Expansion of Synthetic Organic Chemicals - Active Pharmaceutical… — cleared for impact study, 3.5 km away
- Proposed works FRA 2006 and 2008 under section 3(2) for the Water Supply… — withdrawn, 3.6 km away
- Proposal Critical wildlife Habitat of the Bor Wildlife sanctuary — under wildlife review, 5.9 km away
- Proposal Of Bor wildlife sanctuary Crital Tiger Habitat — more information requested, 5.9 km away
- Proposal for Critical Wildlife Habitat — more information requested, 6.7 km away
- Critical wildlife habitat for New Bor Wildlife Sanctuaries — more information requested, 6.7 km away
More from Prashant Meshram in Wardha
- Diversion of Forest Land Required area 200 Sq. meter i.e. 0.02 ha. for… — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.