Quick answers
What is this project?
Wildlife Proposal Towards Tiger Corridor and Necessary Approval From Nbwl, Govt. India for Area Which Falls Around Gumgaon-Kodegaon Mines (212.74) Covering Villages Khapa, Gumgaon, Rajna, Tigai, Savner Under Tiger Corridor is a proposed building project in Khapa, Savner, Nagpur, Maharashtra. The site covers 525.7 acres.
Who is building it?
The applicant is M/S Moil Limited (A Government of India Enterprise).
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Khapa, Savner, Nagpur, Maharashtra.
How big is it?
It has a stated cost of ₹118 crore and a site of 525.7 acres.
When was it filed?
The application was filed on 13 Aug 2024.
Project details
| Status | More information requested |
|---|---|
| Status since | 13 Aug 2024 |
| Application filed | 13 Aug 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | M/S Moil Limited (A Government of India Enterprise) |
| Land area | 525.7 acres (212.7 ha) |
| Project cost | ₹118 crore |
| Village / locality | Khapa |
| Taluk / tehsil | Savner |
| District | Nagpur |
| State | Maharashtra |
| Location from | Site area on record |
| Our reference | WID-MH-16597 |
In context
168 applications in Nagpur since January 2022 are in the same category (Buildings & townships): 128 approved, 22 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 525.7 acres, this one is larger than 98% of them.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khapa, Savner, Nagpur, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amalgamation of Gumgaon and Khodegaon Manganese Mine (Amalgamated Lease Area -… — environmental approval granted, 1.1 km away
- Amalgamation of Gumgaon and Khodegaon Manganese Mine (Amalgamated Lease Area -… — cleared for impact study, 1.1 km away
- Environment Clearance for Bawangaon-B Sand Ghat over an extent of 2.70 ha at… — environmental approval granted, 3.2 km away
- Transfer of EC of Bavangaon-B Sand Ghat , River Kanhan ,Vill Bavangaon ,Tq.… — environmental approval granted, 3.2 km away
- Sand Ghat Proposal of Bavangaon B Sand Ghat Tq. Savner Dist. Nagpur,Nearest… — environmental approval granted, 3.2 km away
- Proposed 1X18 MVA (Submerged Arc Furnace) Silico-Manganese (25,000 TPA)… — environmental approval granted, 3.3 km away
- Environment Clearance for Ramdongri-A Sand Ghat over an extent of 3.15 ha at… — environmental approval granted, 3.5 km away
- The diversion of forest Land of Laying Underground OFC along the existing… — more information requested, 3.5 km away
More from M/S Moil Limited (A Government of India Enterprise) in Nagpur
- Amalgamation of Munsar Manganese Mine & Parsoda Manganese Mine and for… — environmental approval granted
- Amalgamation of Munsar Manganese Mine & Parsoda Manganese Mine and for… — cleared for impact study
- Kandri Manganese Mine — environmental approval granted
- Kandri Manganese Mine — cleared for impact study
8 Moil projects in Nagpur
All 25 Moil projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.