Quick answers
What is Electrification of Gherawadi Adiwashi Wadi?
Electrification of Gherawadi Adiwashi Wadi is a proposed power project in Apte, Panvel, Raigarh, Maharashtra. The site covers 0.3 acres.
Who is building it?
The applicant is Maharashtra State Electricity Distribution Co Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Apte, Panvel, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹25 lakh and a site of 0.3 acres.
When was it filed?
The application was filed on 7 Jan 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 7 Jan 2025 |
| Application filed | 7 Jan 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Power |
| Applicant | Maharashtra State Electricity Distribution Co Limited |
| Land area | 1,400 m² |
| Project cost | ₹25 lakh |
| Village / locality | Apte |
| Taluk / tehsil | Panvel |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16609 |
In context
5 applications in Raigarh since January 2022 are in the same category (Power): 1 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Apte, Panvel, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- New Road At.Apta Gherawadi, Post- Apta, tal-Panvel — more information requested, 0 m away
- Diversion of Restored Private Forest Land (Restored Before 25/10/1980) for… — lapsed, 1.3 km away
- Laying Underground Optical Fiber Cable along the road in ROW of NH-66 from… — forest land use approved, 2.5 km away
- Laying of Ofc Underground From Panvel to Pen for Providing High Speed Digital… — application filed, 2.5 km away
- Laying of Ofc Underground From Panvel to Pen for Providing High Speed Digital… — under wildlife review, 2.5 km away
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable Along… — more information requested, 2.6 km away
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable Along… — lapsed, 2.6 km away
- jal Jeevan Water supply Scheme at Koral to Gherawadi — more information requested, 2.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.