One of 2 filings for this project. The project's main page, with every filing and where each stands: 4 Lane Access Controlled Greenfield Section from Km 375 (Kannad, Telwadi to Km 390…
Project details
| Official title | Construction of 4 Lane Access Controlled Greenfield Section from Km 375 (Kannad, Telwadi to Km 390 (Bodhre) (Total Length 14.895 Km) in Autram Ghat including Tunnel (5.5 Km) & Viaduct (3.280 Km) in the state of Maharashtra |
|---|---|
| Status | Application filed |
| Status since | 13 Dec 2025 |
| Application filed | 13 Dec 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | National Highways Authority of India (NHAI) |
| Project cost | ₹2,762 crore |
| Village / locality | Andhaner |
| Taluk / tehsil | Kannad |
| District | Aurangabad |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16648 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Jan 2026 | More information requested | ₹27.6 crore | |
| New project filed 13 Dec 2025 (this page) | Application filed | ₹2,762 crore |
In context
15 applications in Aurangabad since January 2022 are in the same category (Other): 0 approved, 13 filed or under review, and 2 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Andhaner, Kannad, Aurangabad, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4 Lane Access Controlled Greenfield Section from Km 375 (Kannad, Telwadi to Km… — more information requested, 0 m away
- "Construction of 4 Lane Access Controlled Greenfield Section from Km 375… — under forest review, 0 m away
- "Construction of 4 Lane Access Controlled Greenfield Section from Km 375… — withdrawn, 0 m away
- 4 Lane Access Controlled Greenfield Section from Km 375 (Kannad, Telwadi to Km… — under wildlife review, 150 m away
- MahaNET-I(Bharat NET-II) Aurangabad Kannad — lapsed, 7.4 km away
- Re-Diversion of forest land for Laying Underground Optical Fiber Cable along… — lapsed, 20.8 km away
- Laying Underground Optical Fiber Cable along the road in RoW of SH-51 passing… — more information requested, 21.8 km away
- Laying Underground Optical Fiber Cable along the road in RoW of SH-51 passing… — application filed, 22.5 km away
More from National Highways Authority of India (NHAI) in Aurangabad
- 4 Lane Access Controlled Greenfield Section from Km 375 (Kannad, Telwadi to Km… — under wildlife review
- "Construction of 4 Lane Access Controlled Greenfield Section from Km 375… — under forest review
- "Construction of 4 Lane Access Controlled Greenfield Section from Km 375… — withdrawn
7 National Highways Authority of India (NHAI) projects in Aurangabad
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.