One of 3 filings for this project. The project's main page, with every filing and where each stands: Erection of 4G Ground Based Tower Under USO 4G saturation Project. Execution by BSNL on…
Project details
| Official title | Erection of 4G Ground Based Tower Under USO 4G saturation Project. Execution by BSNL on behalf of Govt. of India at Village Zari Bajar, Taluka-Telhara District-Akola in the State of Maharashtra. |
|---|---|
| Status | More information requested |
| Status since | 3 Jul 2025 |
| Application filed | 3 Jul 2025 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Project cost | ₹30 lakh |
| Village / locality | Zari |
| Taluk / tehsil | Telhara |
| District | Akola |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16697 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Jul 2025 | More information requested | 0 acres | ₹30 lakh |
| New project filed 3 Jul 2025 (this page) | More information requested | 0 acres | ₹30 lakh |
| New project filed 19 Jun 2025 | More information requested | 0 acres | ₹30 lakh |
In context
38 applications in Akola since January 2022 are in the same category (Buildings & townships): 3 approved, 29 filed or under review, and 6 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Zari, Telhara, Akola, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Erection of 4G Ground Based Tower Under USO 4G saturation Project. Execution… — more information requested, 0 m away
- Erection of 4G Ground Based Tower under USO 4G Saturation Project, execution… — more information requested, 0 m away
- Popatkhed 97 Village Regional Rural Water Supply Scheme — more information requested, 450 m away
- New 33/11 Kv Diwanzari Substation of MSEDCL At Zari Bazar Road Tah-Telhara,… — under wildlife review, 450 m away
- New 33/11 KV Diwanzari Substation of MSEDCL at Zari Bazar Road Tah. – Telhara… — more information requested, 450 m away
- New 33/11 KV Diwanzari Substation of MSEDCL at Zari Bazar Road Tah. – Telhara… — more information requested, 450 m away
- Improvement of existing Diwanzari Hiwarkhed Telhara Adsul Road SH-279 from Km… — more information requested, 900 m away
- Popatkhed 97 Village Regional Rural Water Supply Scheme — lapsed, 2.7 km away
More from Mahesh Nair in Akola
- Installing of Mobile Tower at Dhotarkhed under 4G Saturation Project of Govt.… — under wildlife review
- Erection of BSNL 4G Tower in Eco-Sensitive Zone Under 4G Saturation Project of… — more information requested
- Erection of BSNL 4G Tower in Eco-Sensitive Zone Under 4G Saturation Project of… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.