Under wildlife reviewBuildings & townships · Satara, Maharashtra

Wildlife Clearance From Sbwl / Nbwl for Diversion of Non-Forest Land Within the Boundary of Koyna Wl Sanctuary, & Within the Notified Buffer Zone of Str, for Construction of Minor Irrigation Tank (Earthen Dam) , Laying of Underground 400 Mm to 1000 Mm Dia. Pipeline for Irrigation & Construction of Metal Approach Road to Dam Site

Wildlife Clearance From Sbwl / Nbwl for Diversion of Non-Forest Land Within the Boundary of Koyna Wl Sanctuary, & Within the Notified Buffer Zone of Str, for Construction of Minor Irrigation Tank (Earthen Dam) , Laying of Underground 400 Mm to 1000 Mm Dia. Pipeline for Irrigation & Construction of Metal Approach Road to Dam Site is a proposed building project in Gokul Tarf Helwak, Patan, Satara, Maharashtra. The site covers 56.2 acres. Its stated project cost is ₹22.6 crore. As of 27 Nov 2026, its status is “Under wildlife review” (since 12 Jun 2025).

See it on the live map All projects in Satara

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Wildlife Clearance From Sbwl / Nbwl for Diversion of Non-Forest Land Within the Boundary of Koyna Wl Sanctuary, & Within the Notified Buffer Zone of Str, for Construction of Minor Irrigation Tank (Earthen Dam) , Laying of Underground 400 Mm to 1000 Mm Dia. Pipeline for Irrigation & Construction of Metal Approach Road to Dam Site is a proposed building project in Gokul Tarf Helwak, Patan, Satara, Maharashtra. The site covers 56.2 acres.

Who is building it?

The applicant is Varun Tukaram Mote.

Has it been approved?

Not yet. The application is still under review: its status is “Under wildlife review”, as of 27 Nov 2026.

Where is it?

In Gokul Tarf Helwak, Patan, Satara, Maharashtra.

How big is it?

It has a stated cost of ₹22.6 crore and a site of 56.2 acres.

When was it filed?

The application was filed on 12 Jun 2025.

Project details

Official titleProposal for Wildlife Clearance From Sbwl / Nbwl for Diversion of Non-Forest Land Within the Boundary of Koyna Wl Sanctuary, & Within the Notified Buffer Zone of Str, for Construction of Minor Irrigation Tank (Earthen Dam) , Laying of Underground 400 Mm to 1000 Mm Dia. Pipeline for Irrigation & Construction of Metal Approach Road to Dam Site, at Village Humbarli, Deshmukhwadi, Gokul Tarf Helwak, Tal.- Patan, Dist. Satara.
StatusUnder wildlife review
Status since12 Jun 2025
Application filed12 Jun 2025
Approval soughtWildlife review
Application typeNew project
SectorBuildings & townships
ApplicantVarun Tukaram Mote
Land area56.2 acres (22.7 ha)
Project cost₹22.6 crore
Village / localityGokul Tarf Helwak
Taluk / tehsilPatan
DistrictSatara
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-16769

In context

52 applications in Satara since January 2022 are in the same category (Buildings & townships): 20 approved, 23 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 56.2 acres, this one is larger than 71% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Gokul Tarf Helwak, Patan, Satara, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.