Quick answers
What is this project?
Proposal for Installation of BSNL 4G Tower at Asalpani Village (Village Code: 537668) of GP Asalpani Taluka Goregaon District Gondia under 4G Saturation Project of Govt. of India is a proposed building project in Asalpani, Goregaon, Gondiya, Maharashtra. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Asalpani, Goregaon, Gondiya, Maharashtra.
How big is it?
It has a stated cost of ₹30 lakh and a site of 0 acres.
When was it filed?
The application was filed on 3 Aug 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 3 Aug 2026 |
| Application filed | 3 Aug 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Project cost | ₹30 lakh |
| Village / locality | Asalpani |
| Taluk / tehsil | Goregaon |
| District | Gondiya |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16784 |
In context
19 applications in Gondiya since January 2022 are in the same category (Buildings & townships): 1 approved, 16 filed or under review, and 2 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Asalpani, Goregaon, Gondiya, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Installation for BSNL 4G Tower — under wildlife review, 0 m away
- Nagpur- Jharsuguda Laying 18" dia Natural Gas Pipeline by GAIL — more information requested, 2.8 km away
- Diversion of Forest Land for Laying Underground Optical Fiber Cable Within Row… — lapsed, 11.5 km away
- Diversion of Forest Land for Laying Underground Optical Fiber Cable Within Row… — more information requested, 11.5 km away
- Diversion of Forest Land for Laying Underground Optical Fiber Cable Within Row… — lapsed, 11.5 km away
- Industrial project by M/s. INDUS ORGANICS — under environmental review, 11.9 km away
- Industrial project by M/s. INDUS ORGANICS — cleared for impact study, 11.9 km away
- "Up-gradation of Tirora- Gondia, from km.87.000 (Tirora) to km. 115.200… — more information requested, 13.4 km away
More from Mahesh Nair in Gondiya
- Installation for BSNL 4G Tower — under wildlife review
- Proposal for Installation of BSNL 4G Tower at Tidka Village(Village… — more information requested
- Proposal for Installation of BSNL 4G Tower at Tidka Village(Village… — more information requested
- Proposal for Installation of BSNL 4G Tower at Jabbarkheda Village(Village… — more information requested
- BSNL 4G Tower @ Kohalgaon village village code538216 of Kohalgaon GP Taluka… — more information requested
- BSNL 4G Tower @ Kohalgaon village village code538216 of Kohalgaon GP Taluka… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.