What is Developing? Open the mapMap

Application filedRoads & highways · Ahmadnagar, Maharashtra

Major Bridge with Approaches on Godavari River Connecting Sankateshwar Temple at Nevargaon Tal. Gangapur To MDR-7 Ch. 34+700 At Suregaon Tal. Newasa, District Ahilyanagar in the State of Maharashtra on EPC Mode

Major Bridge with Approaches on Godavari River Connecting Sankateshwar Temple at Nevargaon Tal. Gangapur To MDR-7 Ch. 34+700 At Suregaon Tal. Newasa, District Ahilyanagar in the State of Maharashtra on EPC Mode is a proposed road project in Belpandhari, Nevasa, Ahmadnagar, Maharashtra. The site covers 2.1 acres. Its stated project cost is ₹44.7 crore. As of 27 Nov 2026, its status is “Application filed” (since 7 May 2026).

See it on the live map All projects in Ahmadnagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Major Bridge with Approaches on Godavari River Connecting Sankateshwar Temple at Nevargaon Tal. Gangapur To MDR-7 Ch. 34+700 At Suregaon Tal. Newasa, District Ahilyanagar in the State of Maharashtra on EPC Mode is a proposed road project in Belpandhari, Nevasa, Ahmadnagar, Maharashtra. The site covers 2.1 acres.

Who is building it?

The applicant is E. G. S. (Works) Department, Ahilyanagar.

Has it been approved?

Not yet. The application is still under review: its status is “Application filed”, as of 27 Nov 2026.

Where is it?

In Belpandhari, Nevasa, Ahmadnagar, Maharashtra.

How big is it?

It has a stated cost of ₹44.7 crore and a site of 2.1 acres.

When was it filed?

The application was filed on 7 May 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Major Bridge with Approaches on Godavari River Connecting Sankateshwar Temple at…

Project details

Official titleConstruction of Major Bridge with Approaches on Godavari River Connecting Sankateshwar Temple at Nevargaon Tal. Gangapur To MDR-7 Ch. 34+700 At Suregaon Tal. Newasa, District Ahilyanagar in the State of Maharashtra on EPC Mode.
StatusApplication filed
Status since7 May 2026
Application filed7 May 2026
Approval soughtWildlife review
Application typeNew project
SectorRoads & highways
ApplicantE. G. S. (Works) Department, Ahilyanagar
Land area2.1 acres (0.9 ha)
Project cost₹44.7 crore
Village / localityBelpandhari
Taluk / tehsilNevasa
DistrictAhmadnagar
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-16867

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 21 May 2026Under wildlife review2.1 acres₹44.7 crore
New project filed 7 May 2026 (this page)Application filed2.1 acres₹44.7 crore

In context

15 applications in Ahmadnagar since January 2022 are in the same category (Roads & highways): 0 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. At 2.1 acres, this one is smaller than 73% of them.

Where it is

Belpandhari, Nevasa, Ahmadnagar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.