What is Developing? Open the mapMap

More information requestedWater & irrigation · Aurangabad, Maharashtra

Design, Procurement, Testing and Commissiong of Water Treatment Plant (70mld) and Laying of 900mm Dia Water Pipe Line From Jayakwadi Dam to Bidkin

Design, Procurement, Testing and Commissiong of Water Treatment Plant (70mld) and Laying of 900mm Dia Water Pipe Line From Jayakwadi Dam to Bidkin is a proposed water and irrigation project in Dalwadi, Paithan, Aurangabad, Maharashtra. The site covers 2.2 acres. Its stated project cost is ₹20.8 crore. As of 27 Nov 2026, its status is “More information requested” (since 19 Jun 2026).

See it on the live map All projects in Aurangabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusMore information requested
Status since19 Jun 2026
Application filed19 Jun 2026
Approval soughtWildlife review
Application typeNew project
SectorWater & irrigation
ApplicantShyam Marotirao Lawate
Land area2.2 acres (0.9 ha)
Project cost₹20.8 crore
Village / localityDalwadi
Taluk / tehsilPaithan
DistrictAurangabad
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-16881

In context

14 applications in Aurangabad since January 2022 are in the same category (Water & irrigation): 2 approved, 7 filed or under review, and 5 withdrawn, lapsed or rejected. At 2.2 acres, this one is smaller than 92% of them.

15 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Dalwadi, Paithan, Aurangabad, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.