Project details
| Official title | Proposed construction of new residential building on Plot no. 52 to 60 (S. No. 6/70 to 6/78) at village Malyan, Tal. Dahanu, Dist. Palghar by Shri Mihir C Shah. |
|---|---|
| Status | More information requested |
| Status since | 8 Dec 2025 |
| Application filed | 27 Oct 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mihir Chandrakant Shah |
| Land area | 1,300 m² |
| Project cost | ₹3 crore |
| Village / locality | Malyan |
| Taluk / tehsil | Dahanu |
| District | Palghar |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-16932 |
In context
250 applications in Palghar since January 2022 are in the same category (Buildings & townships): 152 approved, 49 filed or under review, and 49 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 0.3 acres, this one is smaller than 96% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Malyan, Dahanu, Palghar, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- New residential buildings on Plot No. 46 to 51 and 61 to 68 (S. No. 6/64 to… — lapsed, 50 m away
- Application for CRZ Clearance under CRZ Notification, 2019 for our proposed… — recommended by coastal authority, 1.6 km away
- Sea View Park on DP reservation no.34 & 35 at survey no. 167A, 170A &170B — lapsed, 1.7 km away
- Anti - Sea Erosion Bund at Dahanu, Dahanu Taluka, Palghar District,… — under coastal review, 2.2 km away
- Anti - Sea Erosion Bund — under coastal review, 2.2 km away
- CRZ Clearance for proposed reconstruction of existing authorized residential… — recommended by coastal authority, 2.3 km away
- CRZ Clearance for Proposed Residential Buildings on land bearing CTS No. 675… — recommended by coastal authority, 2.4 km away
- Proposed reconstruction of existing authorized residential building on land… — recommended by coastal authority, 2.5 km away
More from Mihir Chandrakant Shah in Palghar
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.