Project details
| Official title | Proposed Residential cum Commercial buildings on land bearing Survey No. 226/2, 229/1, 229/2, 229/3 & 229/4 at village Anjur, Taluka- Bhiwandi, Dist- Thane |
|---|---|
| Status | Lapsed |
| Status since | 2 Jul 2026 |
| Application filed | 29 May 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Tejasvi Developers |
| Land area | 4.8 acres (1.9 ha) |
| Project cost | ₹216.3 crore |
| Village / locality | Anjur |
| Taluk / tehsil | Bhiwandi |
| District | Thane |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-17136 |
In context
1,540 applications in Thane since January 2022 are in the same category (Buildings & townships): 1,001 approved, 200 filed or under review, and 339 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.8 acres, this one is larger than 51% of them.
53 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Anjur, Bhiwandi, Thane, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest land for proposed Car Depot of Metro Line-5 at Kasheli… — in-principle approval, conditions pending, 950 m away
- Application for EC Clearance for the proposed development of Residential Cum… — lapsed, 950 m away
- Diversion of Forest Land Involved — lapsed, 1.1 km away
- Design and Construction of Six Lane Road From Saket (Thane) to Amane — lapsed, 1.5 km away
- Proposed Development of Commercial and Residential Buildings by Khushi Axis… — environmental approval granted, 1.5 km away
- Proposed Amendment/Expansion in EC for Integrated Residential Township Project… — environmental approval granted, 1.6 km away
- Proposed Amendment/Expansion in EC for Integrated Residential Township Project… — environmental approval granted, 1.6 km away
- Proposed Amendment/Expansion in EC for Integrated Residential Township Project… — cleared for impact study, 1.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.