Project details
| Official title | Proposed construction of Bank Protection Work (Length - 245 m) at Vadatar Vadis, Ta. Devgad, Dist. Sindhudurg, Maharashtra by Harbour Engineering Department, Sindhudurg (Public Works Department) |
|---|---|
| Status | Recommended by coastal authority |
| Status since | 10 Aug 2026 |
| Application filed | 30 Jun 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | Harbour Engineer, PWD Harbour Division Sindhudurg |
| Land area | 3,700 m² |
| Project cost | ₹2.3 crore |
| Village / locality | Wadetar |
| Taluk / tehsil | Devgad |
| District | Sindhudurg |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-17339 |
In context
28 applications in Sindhudurg since January 2022 are in the same category (Ports & coast): 13 approved, 5 filed or under review, and 10 withdrawn, lapsed or rejected. The approved ones took a median of 41 days from filing to approval. At 0.9 acres, this one is smaller than 76% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Wadetar, Devgad, Sindhudurg, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Retaining Wall at Katta, Tal. Devgad, Dist. Sindhudurg, Maharashtra — returned to applicant, 2.2 km away
- Rahul Ramesh Mungekar — lapsed, 3.2 km away
- Proposed Construction of Bund at Padavane Village, Devgad Taluka, Sindhudurg… — returned to applicant, 4 km away
- Jetty at Kalvi-Koyandewadi, Taluka- Devgad, District– Sindhudurg, Maharashtra — recommended by coastal authority, 4.4 km away
- Groyne Type Bund and Dredging in Navigational Channel at Mithumumbari, Tal.… — lapsed, 5.3 km away
- Anti sea erosion bund (Length - 630.18 m) — recommended by coastal authority, 5.4 km away
- Anti sea erosion bund (Length - 609.87 m) — recommended by coastal authority, 6 km away
- High Level Double Lane Bridge On Mond-Waniwade Creek Connecting MDR-10 &… — coastal clearance granted, 6.6 km away
More from Harbour Engineer, PWD Harbour Division Sindhudurg in Sindhudurg
- Anti Sea Erosion Bund (Length- 483 m) from Shri Vilas Jhad's house to Shri… — recommended by coastal authority
- Bank Protection Work (Length- 215 m) from Chendvan Khari Bund to Chendvan… — lapsed
- Bank Protection Work (Length- 215 m) at Chendvan Sanekar's House, Ta. Kudal,… — lapsed
- Anti Sea Erosion Bund (Length - 472 m) at Devbag (Part 2), Ta. Malvan, Dist.… — returned to applicant
- Anti Sea Erosion Bund (Length- 437 m) from Yashwant Gad Fort to Siddheshwar… — recommended by coastal authority
- Anti Sea Erosion Bund (Length - 474 m) from Vitthal Mandir to Christianwadi at… — returned to applicant
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.