Quick answers
What is this project?
Proposed 6-Lane Access Controlled Section of NH-348B (Greenfield) from Pagote (Km. 0.100) to Chowk (Km. 29.319), Raigad District in the state of Maharashtra is a proposed project in Jambhivali, Panvel, Raigarh, Maharashtra. The site covers 1,731.2 acres.
Who is building it?
The applicant is National Highways Authority of India (NHAI).
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Jambhivali, Panvel, Raigarh, Maharashtra.
How big is it?
It has a stated cost of ₹3,653.1 crore and a site of 1,731.2 acres.
When was it filed?
The application was filed on 5 Sept 2025.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 21 Jan 2026 |
| Application filed | 5 Sept 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Other |
| Applicant | National Highways Authority of India (NHAI) |
| Land area | 1,731.2 acres (700.6 ha) |
| Project cost | ₹3,653.1 crore |
| Village / locality | Jambhivali |
| Taluk / tehsil | Panvel |
| District | Raigarh |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-17558 |
In context
78 applications in Raigarh since January 2022 are in the same category (Other): 17 approved, 38 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 1,731.2 acres, this one is larger than 91% of them.
29 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jambhivali, Panvel, Raigarh, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 6-Lane Access Controlled Section of NH-348B (Greenfield) from Pagote… — cleared for impact study, 0 m away
- Proposed 6-Lane Access Controlled Section of NH-348B (Greenfield) from Pagote… — lapsed, 50 m away
- Proposed 6-Lane Access Controlled Section of NH-348B (Greenfield) from Pagote… — in-principle approval, conditions pending, 50 m away
- jal Jeevan Water supply Scheme at Koral to Gherawadi — more information requested, 600 m away
- Laying Underground Optical Fiber Cable along the road in ROW of NH-66 from… — forest land use approved, 2.7 km away
- Laying of Ofc Underground From Panvel to Pen for Providing High Speed Digital… — application filed, 2.8 km away
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable Along… — more information requested, 2.8 km away
- Re-Diversion of Forest Land for Laying Underground Optical Fiber Cable Along… — lapsed, 2.8 km away
More from National Highways Authority of India (NHAI) in Raigarh
- Proposed 6-Lane Access Controlled Section of NH-348B (Greenfield) from Pagote… — lapsed
- Proposed 6-Lane Access Controlled Section of NH-348B (Greenfield) from Pagote… — lapsed
- Proposed 6-Lane Access Controlled Section of NH-348B (Greenfield) from Pagote… — in-principle approval, conditions pending
- Proposed 6-Lane Access Controlled Section of NH-348B (Greenfield) from Pagote… — cleared for impact study
- Proposed 6-Lane Access Controlled Section of NH-348B (Greenfield) from Pagote… — cleared for impact study
11 National Highways Authority of India (NHAI) projects in Raigarh
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.