What is Developing? Open the mapMap

Recommended by coastal authorityTourism & hotels · Sindhudurg, Maharashtra

Crz Clearance of Proposed Set Up for on Grid Solar Power Plant of 200 Kw & Expansion of Existing Road/Pathway on Property Bearing Survey No. 28, 31, 32, 34, 35 & 39 (Part) at Aarvli, Taluka Vengurla, District Sindhudurg, Maharashtra by M/S. Fomento Resorts and Hotels LTD.

Crz Clearance of Proposed Set Up for on Grid Solar Power Plant of 200 Kw & Expansion of Existing Road/Pathway on Property Bearing Survey No. 28, 31, 32, 34, 35 & 39 (Part) at Aarvli, Taluka Vengurla, District Sindhudurg, Maharashtra by M/S. Fomento Resorts and Hotels LTD is a proposed tourism project in Tank, Vengurla, Sindhudurg, Maharashtra. The site covers 0.5 acres. Its stated project cost is ₹26.5 crore. As of 27 Nov 2026, its status is “Recommended by coastal authority” (since 8 Apr 2026).

See it on the live map All projects in Sindhudurg

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusRecommended by coastal authority
Status since8 Apr 2026
Application filed18 Mar 2026
Approval soughtCoastal review
Application typeNew project
SectorTourism & hotels
ApplicantFomento Resorts and Hotels Limited
Land area2,100 m²
Project cost₹26.5 crore
Village / localityTank
Taluk / tehsilVengurla
DistrictSindhudurg
StateMaharashtra
Location fromSite boundary on record
Our referenceWID-MH-17790

In context

10 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Tank, Vengurla, Sindhudurg, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.