Project details
| Status | Recommended by coastal authority |
|---|---|
| Status since | 8 Apr 2026 |
| Application filed | 18 Mar 2026 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Tourism & hotels |
| Applicant | Fomento Resorts and Hotels Limited |
| Land area | 2,100 m² |
| Project cost | ₹26.5 crore |
| Village / locality | Tank |
| Taluk / tehsil | Vengurla |
| District | Sindhudurg |
| State | Maharashtra |
| Location from | Site boundary on record |
| Our reference | WID-MH-17790 |
In context
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tank, Vengurla, Sindhudurg, Maharashtra. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Anti Sea Erosion Bund (Length - 632 m) at Sagartirtha, Ta. Vengurla, Dist.… — recommended by coastal authority, 1.5 km away
- Anti sea erosion bund (length -653.05 m) — recommended by coastal authority, 2.1 km away
- CRZ Clearance for proposed 5-star resort at S.No. 1, 4, 5, 6,39(pt), 40, 41,… — recommended by coastal authority, 2.3 km away
- Application for Prior Environment Clearance for proposed 5-star Hotel located… — environmental approval granted, 2.3 km away
- Retaining wall at Shiroda Kerwada, Tal. Vengurla, Dist. Sindhudurg — recommended by coastal authority, 3.4 km away
- Anti Sea Erosion Bund (Length- 437 m) from Yashwant Gad Fort to Siddheshwar… — recommended by coastal authority, 3.9 km away
- Anti sea erosion bund (length -351.69 m) — recommended by coastal authority, 4.1 km away
- CRZ Clearance for Construction of Protective Wall Along the Road Leading from… — returned to applicant, 4.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.